ITAC Assessment: SD0212
ITAC logo
ITAC Assessment: SD0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Custom molded injection parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 40,000
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,002 3,000,029
kWh
Electricity Demand $81,011 7,322
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $139,235 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $896 - $673
11,723
kWh
$223
-
kW-mo/yr
- - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $25,608 $16,000 $24,033
415,885
kWh
$11,945
-
kW-mo/yr
$(-10,370.0)
-
MMBtu
- -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $51,749 $13,000 $41,190
712,778
kWh
$14,334
-
kW-mo/yr
$(-3,775.0)
-
MMBtu
- -
04 2.7111: Reduce illumination to minimum necessary levels $10,696 - $7,935
137,456
kWh
$2,761
-
kW-mo/yr
- - -
05 2.7144: Install spectral reflectors / delamp $2,440 $3,840 $1,496
25,791
kWh
$944
-
kW-mo/yr
- - -
06 2.3134: Shift from daytime to nighttime operation $990 - - $990
-
kW-mo/yr
- - -
07 2.6232: Install set-back timers $2,140 $1,000 $2,140
36,928
kWh
- - - -
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,550 $8,500 - - - - $3,550
09 3.8132: Use less toxic and volatile solvent substitutes $1,166 - - - - $1,166
-
gal
-
10 4.232: Lease equipment instead of purchasing $40,000 - - - - - $40,000
TOTAL RECOMMENDED $139,235 $42,340 $77,467
1,340,561
kWh
$31,197
-
kW-mo/yr
$(-14,145.0)
-
MMBtu
$1,166
-
gal
$43,550
TOTAL IMPLEMENTED $16,442 $4,840 $11,571
200,175
kWh
$3,705
-
kW-mo/yr
- $1,166
-
gal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs