ITAC Assessment: SU0508
ITAC logo
ITAC Assessment: SU0508
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Cremanic Rods
NAICS 335991: Carbon and Graphite Product Manufacturing
SIC 3624: Carbon and Graphite Products
Sales Range $10
M
to 50
M
# of Employees 63
Plant Area 196,092
ft2
Annual Production 15,000
units
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $650,858 25,647,839
kWh
Electricity Demand $196,957 27,737
kW-mo/yr
Electricity Fees $45,401 -
Natural Gas $311,193 70,320
MMBtu
Other Energy $4,350 4,350
MMBtu
Waste Disposal Costs
Water Usage $50,000 10,000
Tgal
TOTAL YEARLY COSTS $1,258,758
RECOMMENDED SAVINGS* $42,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $33 - $33
1,327
kWh
- - - -
02 2.7441: Replace broken windows and/or window sash $775 $81 - - $775
-
MMBtu
- -
03 2.7314: Reduce ventilation air $2,405 $499 $626
25,034
kWh
- $1,779
-
MMBtu
- -
04 2.2136: Install / repair insulation on steam lines $202 $107 - - $202
-
MMBtu
- -
05 3.1161: Eliminate/reduce an operation $4,431 $5,566 $61
2,383
kWh
$1,322
-
kW-mo/yr
- - $3,048
06 2.2437: Recover waste heat from equipment $12,878 $15,784 - - $12,878
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $875 $1,160 $267
10,680
kWh
$104
-
kW-mo/yr
- $263 $241
08 2.7135: Install occupancy sensors $3,900 $5,861 $3,900
156,011
kWh
- - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $16,796 $35,087 $12,026
481,029
kWh
$4,680
-
kW-mo/yr
- - $91
10 2.6211: Conserve energy by efficient use of vending machines $158 $393 $158
6,220
kWh
- - - -
11 2.4231: Reduce the pressure of compressed air to the minimum required $291 $1,055 $291
11,647
kWh
- - - -
TOTAL RECOMMENDED $42,743 $65,593 $17,362
694,331
kWh
$6,106
-
kW-mo/yr
$15,633
-
MMBtu
$263 $3,379
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs