ITAC Assessment: SU0499
ITAC logo
ITAC Assessment: SU0499
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Vision and Multisensor Measuring Machines
NAICS 333314: Optical Instrument and Lens Manufacturing
SIC 3827: Optical Instruments and Lenses
Sales Range $10
M
to 50
M
# of Employees 320
Plant Area 181,200
ft2
Annual Production 25,000
units
Production Hrs. Annual 2,340
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,673 2,918,067
kWh
Electricity Demand $151,087 12,103
kW-mo/yr
Electricity Fees $25,772 -
Natural Gas $36,984 6,045
MMBtu
Waste Disposal Costs
Water Usage $13,250 1,080
Tgal
Solid Waste (non-haz) $14,550 500
lb
Solid Waste (haz) $27,630 250
lb
TOTAL YEARLY COSTS $375,946
RECOMMENDED SAVINGS* $35,752 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,125

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $7,584 $534 $3,496
94,500
kWh
$6,553
-
kW-mo/yr
$(-2,465.0)
-
MMBtu
- -
02 2.7314: Reduce ventilation air $2,636 $882 $732
19,797
kWh
- $1,904
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,448 $4,525 $667
18,036
kWh
$307
-
kW-mo/yr
- $977 $496
04 2.4221: Install compressor air intakes in coolest locations $627 $999 $627
16,946
kWh
- - - -
05 3.1161: Eliminate/reduce an operation $6,889 $11,879 $(-170.9)
(-4,620)
kWh
$(-4,925.4)
-
kW-mo/yr
- - $11,985
06 2.7142: Utilize higher efficiency lamps and/or ballasts $15,223 $75,235 $5,119
138,346
kWh
$9,372
-
kW-mo/yr
- $657 $75
07 2.6211: Conserve energy by efficient use of vending machines $345 $64 $345
9,330
kWh
- - - -
TOTAL RECOMMENDED $35,752 $94,118 $10,816
292,335
kWh
$11,307
-
kW-mo/yr
$(-561.1)
-
MMBtu
$1,634 $12,556
TOTAL IMPLEMENTED $35,125 $93,119 $10,189
275,389
kWh
$11,307
-
kW-mo/yr
$(-561.1)
-
MMBtu
$1,634 $12,556
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs