Assessment Year | 2020 |
---|---|
Principal Product | Sheet Metal |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 121 |
Plant Area |
151,100
ft2
|
Annual Production | 988,000
units
|
Production Hrs. Annual | 5,648
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $183,933 | 4,162,583 |
kWh
|
$0.044 |
Electricity Demand | $194,858 | 53,881 |
kW-mo/yr
|
$3.62 |
Electricity Fees | $23,100 | - |
|
- |
Natural Gas | $88,750 | 15,903 |
MMBtu
|
$5.58 |
TOTAL YEARLY COSTS | $490,641 | |||
RECOMMENDED SAVINGS* | $25,660 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $703 | $55 |
$739
16,800
kWh
|
$380
-
kW-mo/yr
|
$(-416.0)
-
MMBtu
|
- | - | |
02 | 2.7314: Reduce ventilation air | $2,795 | $917 |
$958
21,767
kWh
|
- |
$1,837
-
MMBtu
|
- | - | |
03 | 2.7135: Install occupancy sensors | $756 | $547 |
$756
17,186
kWh
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $424 | $436 |
$212
4,818
kWh
|
$24
-
kW-mo/yr
|
- | $77 | $111 | |
05 | 2.4221: Install compressor air intakes in coolest locations | $765 | $1,343 |
$765
17,393
kWh
|
- | - | - | - | |
06 | 3.1161: Eliminate/reduce an operation | $4,106 | $7,548 |
$(-34.0)
(-766)
kWh
|
$(-369.0)
-
kW-mo/yr
|
- | $1,936 | $2,573 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,111 | $36,548 |
$14,311
325,257
kWh
|
$4,344
-
kW-mo/yr
|
- | $1,012 | $(-3,556.0) | |
TOTAL RECOMMENDED | $25,660 | $47,394 |
$17,707
402,455
kWh
|
$4,379
-
kW-mo/yr
|
$1,421
-
MMBtu
|
$3,025 | $(-872.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs