ITAC Assessment: SU0494
ITAC logo
ITAC Assessment: SU0494
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Puzzles
NAICS 322299: All Other Converted Paper Product Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 78
Plant Area 154,000
ft2
Annual Production 8,700,000
units
Production Hrs. Annual 6,318
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,020 1,386,230
kWh
Electricity Demand $36,994 3,649
kW-mo/yr
Electricity Fees $13,786 -
Natural Gas $31,599 4,538
MMBtu
TOTAL YEARLY COSTS $158,399
RECOMMENDED SAVINGS* $27,130 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,901

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $831 - $831
15,110
kWh
- - - -
02 4.821: Pay bills on time to avoid late fees $172 - - - - - $172
03 2.4322: Use or replace with energy efficient substitutes $1,238 - $842
15,300
kWh
$852
-
kW-mo/yr
$(-455.0)
-
MMBtu
- -
04 2.7135: Install occupancy sensors $2,182 $766 $2,182
39,664
kWh
- - - -
05 2.4221: Install compressor air intakes in coolest locations $749 $532 $749
13,611
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $18,491 $13,991 $13,720
249,447
kWh
$5,110
-
kW-mo/yr
- $(-339.0) -
07 2.7314: Reduce ventilation air $1,099 $917 $372
6,771
kWh
- $727
-
MMBtu
- -
08 3.1161: Eliminate/reduce an operation $1,957 $1,928 $(-61.0)
(-1,100)
kWh
$(-686.0)
-
kW-mo/yr
- - $2,704
09 2.6211: Conserve energy by efficient use of vending machines $411 $833 $411
7,475
kWh
- - - -
TOTAL RECOMMENDED $27,130 $18,967 $19,046
346,278
kWh
$5,276
-
kW-mo/yr
$272
-
MMBtu
$(-339.0) $2,876
TOTAL IMPLEMENTED $19,901 $13,991 $14,562
264,747
kWh
$5,962
-
kW-mo/yr
$(-455.0)
-
MMBtu
$(-339.0) $172