ITAC Assessment: SU0493
ITAC logo
ITAC Assessment: SU0493
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Pressure Sensitive Labels, Shrink Wrap, Flexible Packaging
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 97
Plant Area 59,000
ft2
Annual Production 1
units
Production Hrs. Annual 4,750
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,525 1,991,824
kWh
Electricity Demand $84,618 6,407
kW-mo/yr
Electricity Fees $15,137 -
Natural Gas $17,452 2,951
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
Solid Waste (non-haz) $66,550 1
lb
Solid Waste (haz) $5,000 1
lb
TOTAL YEARLY COSTS $269,283
RECOMMENDED SAVINGS* $14,634 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $398

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $7,007 - - - - - $7,007
02 2.8121: Apply for tax-free status for energy purchases $1,073 - - - - - $1,073
03 2.7314: Reduce ventilation air $2,296 $902 $663
16,563
kWh
- $1,633
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $398 $463 $133
3,329
kWh
$61
-
kW-mo/yr
- $204 -
05 3.1161: Eliminate/reduce an operation $3,567 $5,100 $(-15.0)
(-375)
kWh
$(-793.0)
-
kW-mo/yr
- - $4,375
06 2.2437: Recover waste heat from equipment $109 $331 - - $109
-
MMBtu
- -
07 2.4221: Install compressor air intakes in coolest locations $184 $566 $184
4,595
kWh
- - - -
TOTAL RECOMMENDED $14,634 $7,362 $965
24,112
kWh
$(-732.0)
-
kW-mo/yr
$1,742
-
MMBtu
$204 $12,455
TOTAL IMPLEMENTED $398 $463 $133
3,329
kWh
$61
-
kW-mo/yr
- $204 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs