Assessment Year | 2019 |
---|---|
Principal Product | Galvanized Steel |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
24,375
ft2
|
Annual Production | 50,000,000
lb
|
Production Hrs. Annual | 7,644
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $37,997 | 1,811,561 |
kWh
|
$0.021 |
Electricity Demand | $36,647 | 4,981 |
kW-mo/yr
|
$7.36 |
Electricity Fees | $5,947 | - |
|
- |
Natural Gas | $192,775 | 50,628 |
MMBtu
|
$3.81 |
TOTAL YEARLY COSTS | $273,366 | |||
RECOMMENDED SAVINGS* | $194,542 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,705 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $150 | $14 |
$68
3,240
kWh
|
$132
-
kW-mo/yr
|
$(-50.0)
-
MMBtu
|
- | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $370 | $157 | - | - |
$370
-
MMBtu
|
- | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $22,670 | $15,784 | - | - |
$22,670
-
MMBtu
|
- | |
04 | 2.1224: Replace boiler | $168,017 | $185,420 | - | - |
$168,017
-
MMBtu
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $236 | $318 | - | - |
$236
-
MMBtu
|
- | |
06 | 2.7314: Reduce ventilation air | $514 | $929 |
$90
4,350
kWh
|
- |
$424
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,516 | $4,046 |
$1,400
66,663
kWh
|
$1,032
-
kW-mo/yr
|
- | $84 | |
08 | 2.7135: Install occupancy sensors | $69 | $30 |
$69
3,302
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $194,542 | $206,698 |
$1,627
77,555
kWh
|
$1,164
-
kW-mo/yr
|
$191,667
-
MMBtu
|
$84 | ||
TOTAL IMPLEMENTED | $3,705 | $5,480 |
$1,559
74,315
kWh
|
$1,032
-
kW-mo/yr
|
$1,030
-
MMBtu
|
$84 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs