ITAC Assessment: SU0484
ITAC logo
ITAC Assessment: SU0484
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Galvanized Steel
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 24,375
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 7,644
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,997 1,811,561
kWh
Electricity Demand $36,647 4,981
kW-mo/yr
Electricity Fees $5,947 -
Natural Gas $192,775 50,628
MMBtu
TOTAL YEARLY COSTS $273,366
RECOMMENDED SAVINGS* $194,542 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,705

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $150 $14 $68
3,240
kWh
$132
-
kW-mo/yr
$(-50.0)
-
MMBtu
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $370 $157 - - $370
-
MMBtu
-
03 2.2414: Use waste heat from hot flue gases to preheat $22,670 $15,784 - - $22,670
-
MMBtu
-
04 2.1224: Replace boiler $168,017 $185,420 - - $168,017
-
MMBtu
-
05 2.2136: Install / repair insulation on steam lines $236 $318 - - $236
-
MMBtu
-
06 2.7314: Reduce ventilation air $514 $929 $90
4,350
kWh
- $424
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,516 $4,046 $1,400
66,663
kWh
$1,032
-
kW-mo/yr
- $84
08 2.7135: Install occupancy sensors $69 $30 $69
3,302
kWh
- - -
TOTAL RECOMMENDED $194,542 $206,698 $1,627
77,555
kWh
$1,164
-
kW-mo/yr
$191,667
-
MMBtu
$84
TOTAL IMPLEMENTED $3,705 $5,480 $1,559
74,315
kWh
$1,032
-
kW-mo/yr
$1,030
-
MMBtu
$84
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs