ITAC Assessment: SU0483
ITAC logo
ITAC Assessment: SU0483
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Pharma/Food Grade Products
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range $50
M
to 100
M
# of Employees 124
Plant Area 122,360
ft2
Annual Production 14,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $203,411 5,657,192
kWh
Electricity Demand $116,626 10,764
kW-mo/yr
Electricity Fees $31,072 -
Natural Gas $527,462 143,592
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $553,200 1
lb
TOTAL YEARLY COSTS $1,431,771
RECOMMENDED SAVINGS* $22,799 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,641

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 4.821: Pay bills on time to avoid late fees $1,917 - - - - - $1,917
02 2.4231: Reduce the pressure of compressed air to the minimum required $498 - $498
13,867
kWh
- - - -
03 2.8121: Apply for tax-free status for energy purchases $8,883 $264 - - - - $8,883
04 2.4322: Use or replace with energy efficient substitutes $975 $90 $346
9,600
kWh
$780
-
kW-mo/yr
$(-150.0)
-
MMBtu
- -
05 2.4221: Install compressor air intakes in coolest locations $1,947 $624 $1,947
54,086
kWh
- - - -
06 2.7447: Install vinyl strip / high speed / air curtain doors $86 $49 - - $86
-
MMBtu
- -
07 3.1161: Eliminate/reduce an operation $4,545 $2,937 $(-48.0)
1,333
kWh
$(-389.9)
-
kW-mo/yr
- - $4,983
08 2.7142: Utilize higher efficiency lamps and/or ballasts $397 $576 $88
2,453
kWh
$37
-
kW-mo/yr
- $182 $90
09 2.7142: Utilize higher efficiency lamps and/or ballasts $3,136 $5,186 $2,145
59,604
kWh
$884
-
kW-mo/yr
- - $107
10 2.7134: Use photocell controls $256 $460 $256
7,103
kWh
- - - -
11 2.6211: Conserve energy by efficient use of vending machines $110 $357 $110
3,066
kWh
- - - -
12 2.7224: Reduce space conditioning during non-working hours $48 $163 - - $48
-
MMBtu
- -
TOTAL RECOMMENDED $22,799 $10,705 $5,342
151,112
kWh
$1,310
-
kW-mo/yr
$(-15.7)
-
MMBtu
$182 $15,980
TOTAL IMPLEMENTED $22,641 $10,185 $5,232
148,046
kWh
$1,310
-
kW-mo/yr
$(-64.0)
-
MMBtu
$182 $15,980
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs