Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Power generation equipment and piping
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 58
Plant Area 51,250
ft2
Annual Production 1,000
units
Production Hrs. Annual 3,120
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,505 698,529
kWh
Electricity Demand $29,185 2,842
kW-mo/yr
Electricity Fees $3,684 -
Other Gas $79,265 4,002
MMBtu
TOTAL YEARLY COSTS $158,639
RECOMMENDED SAVINGS* $12,848 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,323

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $733 - $733
10,951
kWh
- - -
02 2.7447: Install vinyl strip / high speed / air curtain doors $1,486 $300 - - $1,486
-
MMBtu
-
03 2.4322: Use or replace with energy efficient substitutes $1,267 $113 $1,206
18,000
kWh
$1,386
-
kW-mo/yr
$(-1,325.0)
-
MMBtu
-
04 2.2511: Insulate bare equipment $6,520 $500 - - $6,520
-
MMBtu
-
05 2.7224: Reduce space conditioning during non-working hours $1,382 $383 - - $1,382
-
MMBtu
-
06 2.2136: Install / repair insulation on steam lines $584 $500 - - $584
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $453 $301 $223
3,329
kWh
$47
-
kW-mo/yr
- $183
08 2.6211: Conserve energy by efficient use of vending machines $423 $714 $423
6,314
kWh
- - -
TOTAL RECOMMENDED $12,848 $2,811 $2,585
38,594
kWh
$1,433
-
kW-mo/yr
$8,647
-
MMBtu
$183
TOTAL IMPLEMENTED $9,323 $1,300 $733
10,951
kWh
- $8,590
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs