ITAC Assessment: OR0461
ITAC logo
ITAC Assessment: OR0461
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Ion Guns
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range $100
M
to 500
M
# of Employees 380
Plant Area 180,000
ft2
Annual Production 36
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $411,223 8,186,800
kWh
Electricity Demand $73,093 14,530
kW-mo/yr
Electricity Fees $18,655 -
Natural Gas $12,256 1,398
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,682,130 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,377,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $2,372,930 $1,150 - - $(-27,070.0) - $2,400,000
02 4.652: Replace existing equipment with more suitable substitutes $303,000 $1,000 - - - $(-180,000.0) $483,000
03 2.6218: Turn off equipment when not in use $4,290 $2,690 $3,640
72,550
kWh
$650
-
kW-mo/yr
- - -
04 2.7135: Install occupancy sensors $1,910 $875 $1,910
38,100
kWh
- - - -
TOTAL RECOMMENDED $2,682,130 $5,715 $5,550
110,650
kWh
$650
-
kW-mo/yr
$(-27,070.0) $(-180,000.0) $2,883,000
TOTAL IMPLEMENTED $2,377,220 $3,840 $3,640
72,550
kWh
$650
-
kW-mo/yr
$(-27,070.0) - $2,400,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs