Assessment Year | 2014 |
---|---|
Principal Product | Potationally molded & thermoformed plastic products |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 18 |
Plant Area |
67,000
ft2
|
Annual Production | 25,000
pieces
|
Production Hrs. Annual | 4,394
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $29,310 | 290,240 |
kWh
|
$0.10 |
Natural Gas | $63,167 | 10,127 |
MMBtu
|
$6.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,401 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,392 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $545 | - |
$545
5,394
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $216 | $13 |
$216
2,141
kWh
|
- | |
03 | 2.6232: Install set-back timers | $1,201 | $196 |
$424
4,201
kWh
|
$777
-
MMBtu
|
|
04 | 2.7135: Install occupancy sensors | $147 | $76 |
$147
1,457
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $282 | $357 |
$282
2,794
kWh
|
- | |
06 | 2.2511: Insulate bare equipment | $655 | $2,312 | - |
$655
-
MMBtu
|
|
07 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $1,354 | $5,025 | - |
$1,354
-
MMBtu
|
|
TOTAL RECOMMENDED | $4,401 | $7,979 |
$1,615
15,987
kWh
|
$2,786
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,392 | $642 |
$1,615
15,987
kWh
|
$777
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs