ITAC Assessment: IP0028
ITAC logo
ITAC Assessment: IP0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Potationally molded & thermoformed plastic products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area 67,000
ft2
Annual Production 25,000
pieces
Production Hrs. Annual 4,394
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,310 290,240
kWh
Natural Gas $63,167 10,127
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,401 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,392

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $545 - $545
5,394
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $216 $13 $216
2,141
kWh
-
03 2.6232: Install set-back timers $1,201 $196 $424
4,201
kWh
$777
-
MMBtu
04 2.7135: Install occupancy sensors $147 $76 $147
1,457
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $282 $357 $282
2,794
kWh
-
06 2.2511: Insulate bare equipment $655 $2,312 - $655
-
MMBtu
07 2.1135: Repair furnaces and oven doors so that they seal efficiently $1,354 $5,025 - $1,354
-
MMBtu
TOTAL RECOMMENDED $4,401 $7,979 $1,615
15,987
kWh
$2,786
-
MMBtu
TOTAL IMPLEMENTED $2,392 $642 $1,615
15,987
kWh
$777
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs