Assessment Year | 2019 |
---|---|
Principal Product | MOV Disks, Surge Arrestors and Three Phase Gang Switch |
NAICS | 335931: Current-Carrying Wiring Device Manufacturing |
SIC | 3612: Power, Distribution, and Specialty Transformers |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
207,000
ft2
|
Annual Production | 2,303,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $83,308 | 9,930,930 |
kWh
|
$0.008 | |
Electricity Demand | $86,374 | 18,132 |
kW-mo/yr
|
$4.76 | |
Natural Gas | $140,086 | 33,070 |
MMBtu
|
$4.24 | |
Waste Disposal Costs | |||||
Water Usage | $27,556 | 1 |
Tgal
|
$27,556.00 | |
Water Disposal | $31,639 | 1 |
Tgal
|
$31,639.00 | |
Solid Waste (non-haz) | $111,119 | 1 |
lb
|
$111,119.00 | |
TOTAL YEARLY COSTS | $480,082 | ||||
RECOMMENDED SAVINGS* | $21,987 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $16,916 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7122: Disconnect ballasts | $1,094 | $3,500 |
$523
62,375
kWh
|
$571
-
kW-mo/yr
|
- | - | - | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $6,517 | $2,500 | - | - | - |
$6,517
-
MMBtu
|
- | |
03 | 2.7134: Use photocell controls | $425 | $570 |
$425
50,601
kWh
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $357 | $650 |
$39
4,643
kWh
|
$30
-
kW-mo/yr
|
- | - | $288 | |
05 | 2.3212: Optimize plant power factor | $8,523 | $18,735 | - | - | $8,523 | - | - | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $5,071 | $16,284 | - | - | - |
$5,071
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $21,987 | $42,239 |
$987
117,619
kWh
|
$601
-
kW-mo/yr
|
$8,523 |
$11,588
-
MMBtu
|
$288 | ||
TOTAL IMPLEMENTED | $16,916 | $25,955 |
$987
117,619
kWh
|
$601
-
kW-mo/yr
|
$8,523 |
$6,517
-
MMBtu
|
$288 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs