ITAC Assessment: SU0474
ITAC logo
ITAC Assessment: SU0474
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product MOV Disks, Surge Arrestors and Three Phase Gang Switch
NAICS 335931: Current-Carrying Wiring Device Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 207,000
ft2
Annual Production 2,303,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,308 9,930,930
kWh
Electricity Demand $86,374 18,132
kW-mo/yr
Natural Gas $140,086 33,070
MMBtu
Waste Disposal Costs
Water Usage $27,556 1
Tgal
Water Disposal $31,639 1
Tgal
Solid Waste (non-haz) $111,119 1
lb
TOTAL YEARLY COSTS $480,082
RECOMMENDED SAVINGS* $21,987 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,916

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.7122: Disconnect ballasts $1,094 $3,500 $523
62,375
kWh
$571
-
kW-mo/yr
- - -
02 2.7447: Install vinyl strip / high speed / air curtain doors $6,517 $2,500 - - - $6,517
-
MMBtu
-
03 2.7134: Use photocell controls $425 $570 $425
50,601
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $357 $650 $39
4,643
kWh
$30
-
kW-mo/yr
- - $288
05 2.3212: Optimize plant power factor $8,523 $18,735 - - $8,523 - -
06 2.2414: Use waste heat from hot flue gases to preheat $5,071 $16,284 - - - $5,071
-
MMBtu
-
TOTAL RECOMMENDED $21,987 $42,239 $987
117,619
kWh
$601
-
kW-mo/yr
$8,523 $11,588
-
MMBtu
$288
TOTAL IMPLEMENTED $16,916 $25,955 $987
117,619
kWh
$601
-
kW-mo/yr
$8,523 $6,517
-
MMBtu
$288
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs