ITAC Assessment: SU0471
ITAC logo
ITAC Assessment: SU0471
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Frozen Cheese Filled Pasta
NAICS 311412: Frozen Specialty Food Manufacturing
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 30
Plant Area 60,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 5,330
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,796 2,134,486
kWh
Electricity Demand $91,674 7,630
kW-mo/yr
Electricity Fees $3,962 -
Natural Gas $54,630 10,919
MMBtu
Waste Disposal Costs
Water Usage $4,125 193
Tgal
TOTAL YEARLY COSTS $256,187
RECOMMENDED SAVINGS* $8,067 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,238

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $529 $179 - - - $529
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,460 $2,625 $1,790
35,800
kWh
$1,004
-
kW-mo/yr
- - - $666
03 2.7142: Utilize higher efficiency lamps and/or ballasts $247 $271 $118
2,365
kWh
$38
-
kW-mo/yr
- - $64 $26
04 2.7135: Install occupancy sensors $955 $1,560 $955
19,095
kWh
- - - - -
05 2.4221: Install compressor air intakes in coolest locations $703 $1,240 $703
14,055
kWh
- - - - -
06 2.2123: Insulate feedwater tank $75 $172 - - - $75
-
MMBtu
- -
07 2.3212: Optimize plant power factor $2,099 $6,608 - - $2,099 - - -
TOTAL RECOMMENDED $8,067 $12,655 $3,566
71,315
kWh
$1,042
-
kW-mo/yr
$2,099 $604
-
MMBtu
$64 $692
TOTAL IMPLEMENTED $4,238 $4,037 $2,493
49,855
kWh
$1,004
-
kW-mo/yr
- $75
-
MMBtu
- $666
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs