Assessment Year | 2018 |
---|---|
Principal Product | Fluid Milk |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $10 M to 50M |
# of Employees | 35 |
Plant Area |
50,000
ft2
|
Annual Production | 300,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $165,825 | 3,691,820 |
kWh
|
$0.045 | |
Electricity Demand | $92,820 | 8,889 |
kW-mo/yr
|
$10.44 | |
Electricity Fees | $19,827 | - |
|
- | |
Natural Gas | $353,049 | 85,739 |
MMBtu
|
$4.12 | |
Waste Disposal Costs | |||||
Water Usage | $102,000 | 1,800,000 |
Tgal
|
$0.057 | |
TOTAL YEARLY COSTS | $733,521 | ||||
RECOMMENDED SAVINGS* | $29,352 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $1,204 | $316 |
$1,204
26,765
kWh
|
- | - | - | |
02 | 2.2511: Insulate bare equipment | $2,578 | $1,066 | - | - |
$2,578
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,945 | $3,308 |
$4,439
98,641
kWh
|
$1,441
-
kW-mo/yr
|
- | $65 | |
04 | 2.2123: Insulate feedwater tank | $205 | $136 | - | - |
$205
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $266 | $260 |
$118
2,628
kWh
|
$38
-
kW-mo/yr
|
- | $110 | |
06 | 2.7135: Install occupancy sensors | $2,378 | $3,342 |
$2,378
52,842
kWh
|
- | - | - | |
07 | 2.4133: Use most efficient type of electric motors | $16,776 | $58,680 |
$16,776
372,800
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $29,352 | $67,108 |
$24,915
553,676
kWh
|
$1,479
-
kW-mo/yr
|
$2,783
-
MMBtu
|
$175 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs