ITAC Assessment: SU0466
ITAC logo
ITAC Assessment: SU0466
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Welded Carbon Steel Tubing
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 121
Plant Area 62,550
ft2
Annual Production 36,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $515,570 11,535,095
kWh
Electricity Demand $327,901 28,928
kW-mo/yr
Electricity Fees $38,273 -
Natural Gas $72,597 14,310
MMBtu
TOTAL YEARLY COSTS $954,341
RECOMMENDED SAVINGS* $197,726 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,351

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 3.1161: Eliminate/reduce an operation $9,225 $1,173 - - $4,164 - $5,061
02 2.4221: Install compressor air intakes in coolest locations $5,326 $2,058 $5,326
119,152
kWh
- - - -
03 3.1191: Change procedures / equipment / operating conditions $166,039 $203,490 - - - $18,000 $148,039
04 2.7142: Utilize higher efficiency lamps and/or ballasts $586 $876 $183
4,100
kWh
$64
-
kW-mo/yr
$339 - -
05 2.6211: Conserve energy by efficient use of vending machines $111 $217 $111
2,477
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $16,439 $44,602 $8,334
186,450
kWh
$4,142
-
kW-mo/yr
$3,963 - -
TOTAL RECOMMENDED $197,726 $252,416 $13,954
312,179
kWh
$4,206
-
kW-mo/yr
$8,466 $18,000 $153,100
TOTAL IMPLEMENTED $22,351 $47,536 $13,843
309,702
kWh
$4,206
-
kW-mo/yr
$4,302 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs