Assessment Year | 2018 |
---|---|
Principal Product | Welded Carbon Steel Tubing |
NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $10 M to 50M |
# of Employees | 121 |
Plant Area |
62,550
ft2
|
Annual Production | 36,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $515,570 | 11,535,095 |
kWh
|
$0.045 |
Electricity Demand | $327,901 | 28,928 |
kW-mo/yr
|
$11.34 |
Electricity Fees | $38,273 | - |
|
- |
Natural Gas | $72,597 | 14,310 |
MMBtu
|
$5.07 |
TOTAL YEARLY COSTS | $954,341 | |||
RECOMMENDED SAVINGS* | $197,726 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,351 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.1161: Eliminate/reduce an operation | $9,225 | $1,173 | - | - | $4,164 | - | $5,061 | |
02 | 2.4221: Install compressor air intakes in coolest locations | $5,326 | $2,058 |
$5,326
119,152
kWh
|
- | - | - | - | |
03 | 3.1191: Change procedures / equipment / operating conditions | $166,039 | $203,490 | - | - | - | $18,000 | $148,039 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $586 | $876 |
$183
4,100
kWh
|
$64
-
kW-mo/yr
|
$339 | - | - | |
05 | 2.6211: Conserve energy by efficient use of vending machines | $111 | $217 |
$111
2,477
kWh
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,439 | $44,602 |
$8,334
186,450
kWh
|
$4,142
-
kW-mo/yr
|
$3,963 | - | - | |
TOTAL RECOMMENDED | $197,726 | $252,416 |
$13,954
312,179
kWh
|
$4,206
-
kW-mo/yr
|
$8,466 | $18,000 | $153,100 | ||
TOTAL IMPLEMENTED | $22,351 | $47,536 |
$13,843
309,702
kWh
|
$4,206
-
kW-mo/yr
|
$4,302 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs