| Assessment Year | 2018 |
|---|---|
| Principal Product | Aluminum Extruded Bars |
| NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
| SIC | 3354: Aluminum Extruded Products |
| Sales Range | $50 M to 100M |
| # of Employees | 150 |
| Plant Area |
1,193,000
ft2
|
| Annual Production | 31,500,000
units
|
| Production Hrs. Annual | 7,176
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,164,456 | 36,036,000 |
kWh
|
$0.032 | |
| Natural Gas | $1,282,260 | 205,260 |
MMBtu
|
$6.25 | |
| Waste Disposal Costs | |||||
| Water Usage | $948,684 | 258,865 |
Tgal
|
$3.66 | |
| TOTAL YEARLY COSTS | $3,395,400 | ||||
| RECOMMENDED SAVINGS* | $135,737 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $130,888 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7224: Reduce space conditioning during non-working hours | $4,408 | $1,206 |
$626
18,980
kWh
|
$3,782
-
MMBtu
|
- | - | |
| 02 | 2.2123: Insulate feedwater tank | $637 | $386 | - |
$637
-
MMBtu
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $35,546 | $73,000 |
$37,019
1,121,790
kWh
|
- | $1,738 | $(-3,211.0) | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $500 | $740 |
$176
5,343
kWh
|
- | $204 | $120 | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $400 | $780 |
$400
12,136
kWh
|
- | - | - | |
| 06 | 2.6211: Conserve energy by efficient use of vending machines | $208 | $422 |
$208
6,314
kWh
|
- | - | - | |
| 07 | 2.2437: Recover waste heat from equipment | $93,805 | $187,500 | - |
$93,805
-
MMBtu
|
- | - | |
| 08 | 2.7135: Install occupancy sensors | $233 | $537 |
$233
7,054
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $135,737 | $264,571 |
$38,662
1,171,617
kWh
|
$98,224
-
MMBtu
|
$1,942 | $(-3,091.0) | ||
| TOTAL IMPLEMENTED | $130,888 | $262,406 |
$37,595
1,139,269
kWh
|
$94,442
-
MMBtu
|
$1,942 | $(-3,091.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs