ITAC Assessment: UF0143
ITAC logo
ITAC Assessment: UF0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Wheat Flour
NAICS
n/a
SIC 2041: Flour and Other Grain Mill Products
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 28,000
ft2
Annual Production 250,000,000
lb
Production Hrs. Annual 8,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $333,033 8,745,311
kWh
Electricity Demand $127,962 15,953
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $900,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,556 $750 $1,556
29,601
kWh
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,312 $1,700 $2,312
63,599
kWh
- - -
03 2.4133: Use most efficient type of electric motors $12,593 $17,828 $9,032
238,570
kWh
$3,561
-
kW-mo/yr
- -
04 2.8212: Reduce delivery schedules $1,550 - - - $1,550 -
05 4.652: Replace existing equipment with more suitable substitutes $865,200 $68,400 - - - $865,200
06 2.3191: Use demand controller or load shedder $17,269 $15,550 - $17,269
-
kW-mo/yr
- -
TOTAL RECOMMENDED $900,480 $104,228 $12,900
331,770
kWh
$20,830
-
kW-mo/yr
$1,550 $865,200
TOTAL IMPLEMENTED $35,280 $35,828 $12,900
331,770
kWh
$20,830
-
kW-mo/yr
$1,550 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs