ITAC Assessment: UF0518
ITAC logo
ITAC Assessment: UF0518
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Orthopedic Prosthetic and Surgical Appliances and Supplies
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 60,000
ft2
Annual Production 22,000
units
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,307 2,081,366
kWh
Electricity Demand $47,924 5,484
kW-mo/yr
Electricity Fees $31,209 -
Waste Disposal Costs
Water Usage $3,753 772
Tgal
Water Disposal $5,036 728
Tgal
TOTAL YEARLY COSTS $309,229
RECOMMENDED SAVINGS* $150,102 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $150,102

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $24,028 $167,216 $24,028
226,678
kWh
- - -
02 2.7141: Lower light fixtures in high ceiling areas $9,684 $1,980 $1,032
9,734
kWh
$252
-
kW-mo/yr
$8,400 -
03 2.2531: Re-size charging openings or add movable cover or door $3,844 $586 $3,844
36,263
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,401 - $2,401
22,650
kWh
- - -
05 2.7425: Clean or color roof to reduce solar load $1,145 $9,600 $1,145
10,804
kWh
- - -
06 4.514: Re-arrange equipment layout to reduce handling costs $109,000 $41,200 - - - $109,000
TOTAL RECOMMENDED $150,102 $220,582 $32,450
306,129
kWh
$252
-
kW-mo/yr
$8,400 $109,000
TOTAL IMPLEMENTED $150,102 $220,582 $32,450
306,129
kWh
$252
-
kW-mo/yr
$8,400 $109,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs