Assessment Year | 1999 |
---|---|
Principal Product | Rotors |
NAICS |
n/a
|
SIC | 3621: Motors and Generators |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
35,200
ft2
|
Annual Production | 38,000,000
pieces
|
Production Hrs. Annual | 4,466
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $79,054 | 4,984,467 |
kWh
|
$0.016 |
Electricity Demand | $87,821 | 1,028 |
kW-mo/yr
|
$85.43 |
Electricity Fees | $9,135 | - |
|
- |
Natural Gas | $19,226 | 4,199 |
MMBtu
|
$4.58 |
LPG | $2,793 | 95 |
MMBtu
|
$29.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $47,492 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,264 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.423: Move product using mechanical means | $1,228 | $3,360 | - | - | - | $1,228 | |
02 | 4.513: Re-arrange equipment layout to reduce labor costs | $900 | $1,831 | - | - | - | $900 | |
03 | 4.126: Install sensors to detect defects | $27,239 | $13,276 | - | - | - | $27,239 | |
04 | 2.4221: Install compressor air intakes in coolest locations | $910 | $100 |
$483
27,257
kWh
|
$427
-
kW-mo/yr
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $1,713 | $3,862 |
$773
43,669
kWh
|
$940
-
kW-mo/yr
|
- | - | |
06 | 3.5313: Increase amount of waste recovered for resale | $15,502 | $17,960 | - | - |
$15,502
-
lb
|
- | |
TOTAL RECOMMENDED | $47,492 | $40,389 |
$1,256
70,926
kWh
|
$1,367
-
kW-mo/yr
|
$15,502
-
lb
|
$29,367 | ||
TOTAL IMPLEMENTED | $46,264 | $37,029 |
$1,256
70,926
kWh
|
$1,367
-
kW-mo/yr
|
$15,502
-
lb
|
$28,139 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs