ITAC Assessment: SU0456
ITAC logo
ITAC Assessment: SU0456
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Wheat Flour
NAICS 311211: Flour Milling
SIC 2041: Flour and Other Grain Mill Products
Sales Range $100
M
to 500
M
# of Employees 80
Plant Area 400,000
ft2
Annual Production 540,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $622,408 26,269,300
kWh
Electricity Demand $572,242 60,021
kW-mo/yr
Electricity Fees $34,753 -
Natural Gas $59,941 13,066
MMBtu
TOTAL YEARLY COSTS $1,289,344
RECOMMENDED SAVINGS* $76,760 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,760

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $6,138 - - - - - - $6,138
02 2.4221: Install compressor air intakes in coolest locations $717 - $717
29,857
kWh
- - - - -
03 2.7224: Reduce space conditioning during non-working hours $150 - - - - $150
-
MMBtu
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $28,600 $675 - $28,600
-
kW-mo/yr
- - - -
05 3.1161: Eliminate/reduce an operation $5,417 $1,800 $(-22.0)
(-910)
kWh
$(-229.0)
-
kW-mo/yr
- - $1,300 $4,368
06 2.7142: Utilize higher efficiency lamps and/or ballasts $194 $125 $32
1,314
kWh
$17
-
kW-mo/yr
- - $84 $61
07 2.3212: Optimize plant power factor $27,797 $38,674 - - $27,797 - - -
08 2.7135: Install occupancy sensors $6,863 $15,312 $6,863
285,966
kWh
- - - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $884 $2,658 $799
33,288
kWh
$440
-
kW-mo/yr
- - $17 $(-372.0)
TOTAL RECOMMENDED $76,760 $59,244 $8,389
349,515
kWh
$28,828
-
kW-mo/yr
$27,797 $150
-
MMBtu
$1,401 $10,195
TOTAL IMPLEMENTED $76,760 $59,244 $8,389
349,515
kWh
$28,828
-
kW-mo/yr
$27,797 $150
-
MMBtu
$1,401 $10,195
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs