ITAC Assessment: SU0453
ITAC logo
ITAC Assessment: SU0453
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Wood Moulding
NAICS 321918: Other Millwork (including Flooring)
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 102
Plant Area 51,000
ft2
Annual Production 10,000
thousand feet
Production Hrs. Annual 4,420
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,605 2,909,353
kWh
Electricity Demand $105,253 8,872
kW-mo/yr
Electricity Fees $12,997 -
Natural Gas $77,207 11,395
MMBtu
Waste Disposal Costs
Water Usage $1,482 215
Tgal
TOTAL YEARLY COSTS $311,544
RECOMMENDED SAVINGS* $18,288 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,315

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $3,533 - - - $3,533
-
MMBtu
- -
02 2.7224: Reduce space conditioning during non-working hours $773 - - - $773
-
MMBtu
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $548 - $548
14,040
kWh
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,502 $451 $7,502
192,358
kWh
- - - -
05 3.1161: Eliminate/reduce an operation $1,542 $463 $(-49.0)
(-1,260)
kWh
$(-128.0)
-
kW-mo/yr
- $580 $1,139
06 2.4235: Remove or close off unneeded compressed air lines $3,220 $1,619 $2,580
66,148
kWh
$640
-
kW-mo/yr
- - -
07 2.4221: Install compressor air intakes in coolest locations $325 $239 $325
8,327
kWh
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $266 $258 $113
2,891
kWh
$47
-
kW-mo/yr
- $36 $70
09 2.6211: Conserve energy by efficient use of vending machines $119 $169 $119
3,058
kWh
- - - -
10 2.7134: Use photocell controls $248 $403 $248
6,363
kWh
- - - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $212 $364 $123
3,154
kWh
$103
-
kW-mo/yr
- $8 $(-22.0)
TOTAL RECOMMENDED $18,288 $3,966 $11,509
295,079
kWh
$662
-
kW-mo/yr
$4,306
-
MMBtu
$624 $1,187
TOTAL IMPLEMENTED $13,315 $3,797 $10,842
277,981
kWh
$662
-
kW-mo/yr
- $624 $1,187
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs