Assessment Year | 2017 |
---|---|
Principal Product | Injection molded plastic products |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 80 |
Plant Area |
152,500
ft2
|
Annual Production | 7,341,124
lb
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $145,859 | 3,709,712 |
kWh
|
$0.039 | |
Electricity Demand | $71,169 | 23,237 |
kW-mo/yr
|
$3.06 | |
Electricity Fees | $(-8,750.0) | - |
|
- | |
Natural Gas | $25,778 | 4,907 |
MMBtu
|
$5.25 | |
Waste Disposal Costs | |||||
Water Usage | $8,000 | 1,873 |
Tgal
|
$4.27 | |
TOTAL YEARLY COSTS | $242,056 | ||||
RECOMMENDED SAVINGS* | $20,711 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $19,231 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.821: Pay bills on time to avoid late fees | $2,840 | - | - | - | - | - | $2,840 | |
02 | 2.8121: Apply for tax-free status for energy purchases | $1,037 | - | - | - | - | - | $1,037 | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $841 | - |
$841
21,561
kWh
|
- | - | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $190 | - |
$146
3,744
kWh
|
$44
-
kW-mo/yr
|
- | - | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $250 | $49 | - | - |
$250
-
MMBtu
|
- | - | |
06 | 2.7314: Reduce ventilation air | $3,564 | $915 |
$1,043
26,741
kWh
|
- |
$2,521
-
MMBtu
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,072 | $4,959 |
$3,619
92,803
kWh
|
$876
-
kW-mo/yr
|
- | $2,246 | $331 | |
08 | 3.1161: Eliminate/reduce an operation | $3,150 | $2,940 |
$(-17.0)
(-429)
kWh
|
$(-55.0)
-
kW-mo/yr
|
- | $2,205 | $1,017 | |
09 | 2.2136: Install / repair insulation on steam lines | $253 | $248 | - | - |
$253
-
MMBtu
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $216 | $305 |
$102
2,453
kWh
|
$10
-
kW-mo/yr
|
- | $77 | $27 | |
11 | 2.4221: Install compressor air intakes in coolest locations | $249 | $399 |
$249
6,389
kWh
|
- | - | - | - | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $859 | $1,749 |
$623
15,987
kWh
|
$134
-
kW-mo/yr
|
- | $86 | $16 | |
13 | 2.6211: Conserve energy by efficient use of vending machines | $190 | $550 |
$190
4,866
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $20,711 | $12,114 |
$6,796
174,115
kWh
|
$1,009
-
kW-mo/yr
|
$3,024
-
MMBtu
|
$4,614 | $5,268 | ||
TOTAL IMPLEMENTED | $19,231 | $11,316 |
$6,606
169,249
kWh
|
$1,009
-
kW-mo/yr
|
$2,771
-
MMBtu
|
$4,614 | $4,231 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs