Assessment Year | 2017 |
---|---|
Principal Product | Airport Lighting/ BMF metal forms |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
125,000
ft2
|
Annual Production | 90,000
units
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $36,384 | 1,157,040 |
kWh
|
$0.031 |
Electricity Demand | $45,883 | 4,823 |
kW-mo/yr
|
$9.51 |
Electricity Fees | $6,268 | - |
|
- |
Natural Gas | $41,452 | 10,244 |
MMBtu
|
$4.05 |
TOTAL YEARLY COSTS | $129,987 | |||
RECOMMENDED SAVINGS* | $7,274 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,149 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.1161: Eliminate/reduce an operation | $4,956 | $2,304 |
$(-58.0)
(-1,875)
kWh
|
$343
-
kW-mo/yr
|
- | $1,176 | $3,495 | |
02 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $467 | $936 |
$467
15,058
kWh
|
- | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $59 | $66 |
$21
666
kWh
|
$9
-
kW-mo/yr
|
- | $14 | $15 | |
04 | 2.7314: Reduce ventilation air | $449 | $600 |
$80
2,568
kWh
|
- |
$369
-
MMBtu
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $169 | $416 |
$169
5,442
kWh
|
- | - | - | - | |
06 | 2.4322: Use or replace with energy efficient substitutes | $1,174 | $3,708 |
$318
10,260
kWh
|
$856
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $7,274 | $8,030 |
$997
32,119
kWh
|
$1,208
-
kW-mo/yr
|
$369
-
MMBtu
|
$1,190 | $3,510 | ||
TOTAL IMPLEMENTED | $2,149 | $5,310 |
$886
28,552
kWh
|
$865
-
kW-mo/yr
|
$369
-
MMBtu
|
$14 | $15 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs