ITAC Assessment: SU0438
ITAC logo
ITAC Assessment: SU0438
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Airport Lighting/ BMF metal forms
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 125,000
ft2
Annual Production 90,000
units
Production Hrs. Annual 2,340
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,384 1,157,040
kWh
Electricity Demand $45,883 4,823
kW-mo/yr
Electricity Fees $6,268 -
Natural Gas $41,452 10,244
MMBtu
TOTAL YEARLY COSTS $129,987
RECOMMENDED SAVINGS* $7,274 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,149

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 3.1161: Eliminate/reduce an operation $4,956 $2,304 $(-58.0)
(-1,875)
kWh
$343
-
kW-mo/yr
- $1,176 $3,495
02 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $467 $936 $467
15,058
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $59 $66 $21
666
kWh
$9
-
kW-mo/yr
- $14 $15
04 2.7314: Reduce ventilation air $449 $600 $80
2,568
kWh
- $369
-
MMBtu
- -
05 2.4221: Install compressor air intakes in coolest locations $169 $416 $169
5,442
kWh
- - - -
06 2.4322: Use or replace with energy efficient substitutes $1,174 $3,708 $318
10,260
kWh
$856
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $7,274 $8,030 $997
32,119
kWh
$1,208
-
kW-mo/yr
$369
-
MMBtu
$1,190 $3,510
TOTAL IMPLEMENTED $2,149 $5,310 $886
28,552
kWh
$865
-
kW-mo/yr
$369
-
MMBtu
$14 $15
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs