*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Production machine and job shop
NAICS 333517: Machine Tool Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 26,548
ft2
Annual Production 960,000
lb
Production Hrs. Annual 4,743
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,878 392,960
kWh
Electricity Demand $18,057 1,766
kW-mo/yr
Electricity Fees $5,437 -
Natural Gas $1,664 181
MMBtu
Waste Disposal Costs
Water Usage $826 70,000
Tgal
TOTAL YEARLY COSTS $52,861
RECOMMENDED SAVINGS* $4,182 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,182

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $1,548 - - - - - $1,548
02 2.7122: Disconnect ballasts $145 - $86
1,224
kWh
$59
-
kW-mo/yr
- - -
03 4.821: Pay bills on time to avoid late fees $30 - - - - - $30
04 3.1161: Eliminate/reduce an operation $1,305 $800 $(-43.0)
(-608)
kWh
$(-552.0)
-
kW-mo/yr
- $802 $1,098
05 2.7314: Reduce ventilation air $346 $512 $96
1,372
kWh
- $250
-
MMBtu
- -
06 2.4321: Upgrade obsolete equipment $42 $114 $35
499
kWh
$7
-
kW-mo/yr
- - -
07 2.4221: Install compressor air intakes in coolest locations $293 $778 $293
4,180
kWh
- - - -
08 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $473 $1,875 $473
6,753
kWh
- - - -
TOTAL RECOMMENDED $4,182 $4,079 $940
13,420
kWh
$(-486.0)
-
kW-mo/yr
$250
-
MMBtu
$802 $2,676
TOTAL IMPLEMENTED $4,182 $4,079 $940
13,420
kWh
$(-486.0)
-
kW-mo/yr
$250
-
MMBtu
$802 $2,676
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs