Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Waste Water Treatments
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 4
Plant Area 7,100
ft2
Annual Production 182,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,162 1,192,783
kWh
Electricity Demand $10,899 2,143
kW-mo/yr
Natural Gas $11,569 1,161
MMBtu
Waste Disposal Costs
Water Usage $35,000 262
Tgal
TOTAL YEARLY COSTS $169,630
RECOMMENDED SAVINGS* $8,469 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7261: Install timers and/or thermostats $506 $412 - - $506
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $246 $190 $91
964
kWh
$7
-
kW-mo/yr
- $64 $84
03 2.7134: Use photocell controls $477 $451 $477
5,074
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,749 $7,697 $2,712
28,856
kWh
$366
-
kW-mo/yr
- $2,077 $1,594
05 2.7314: Reduce ventilation air $491 $899 $173
1,845
kWh
- $318
-
MMBtu
- -
TOTAL RECOMMENDED $8,469 $9,649 $3,453
36,739
kWh
$373
-
kW-mo/yr
$824
-
MMBtu
$2,141 $1,678
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs