ITAC Assessment: SU0409
ITAC logo
ITAC Assessment: SU0409
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Table top lighting
NAICS 335121: Residential Electric Lighting Fixture Manufacturing
SIC 3645: Residential Electric Lighting Fixtures
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 112,000
ft2
Annual Production 33,500,000
pieces
Production Hrs. Annual 2,184
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,622 1,084,148
kWh
Electricity Demand $39,518 3,885
kW-mo/yr
Electricity Fees $4,116 -
Natural Gas $17,770 3,244
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,342 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,329

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $802 - - - - - $802
02 2.7314: Reduce ventilation air $1,604 $822 $672
11,013
kWh
- $932
-
MMBtu
- -
03 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $1,899 $1,546 $1,899
31,130
kWh
- - - -
04 2.2136: Install / repair insulation on steam lines $292 $233 - - $292
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $211 $160 $160
2,628
kWh
$37
-
kW-mo/yr
- $12 $2
06 2.7447: Install vinyl strip / high speed / air curtain doors $36 $63 - - $36
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $498 $1,262 $235
3,855
kWh
$54
-
kW-mo/yr
- $100 $109
TOTAL RECOMMENDED $5,342 $4,086 $2,966
48,626
kWh
$91
-
kW-mo/yr
$1,260
-
MMBtu
$112 $913
TOTAL IMPLEMENTED $4,329 $3,926 $2,806
45,998
kWh
$54
-
kW-mo/yr
$1,260
-
MMBtu
$100 $109
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings