ITAC Assessment: SU0402
ITAC logo
ITAC Assessment: SU0402
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Sheet Metal Fabrication Equipment
NAICS 333517: Machine Tool Manufacturing
SIC 3542: Machine Tools, Metal Forming Types
Sales Range $10
M
to 50
M
# of Employees 108
Plant Area 250,000
ft2
Annual Production 40
units
Production Hrs. Annual 2,210
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,475 2,882,400
kWh
Electricity Demand $16,506 7,457
kW-mo/yr
Electricity Fees $515 -
Natural Gas $81,564 15,212
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,808 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,862

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $851 - $652
15,600
kWh
$199
-
kW-mo/yr
- -
02 2.7122: Disconnect ballasts $375 - $287
6,864
kWh
$88
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $6,073 $600 - - $6,073
-
MMBtu
-
04 2.7135: Install occupancy sensors $1,500 $297 $1,500
35,880
kWh
- - -
05 2.7314: Reduce ventilation air $8,182 $2,941 $1,562
37,373
kWh
- $6,620
-
MMBtu
-
06 3.1161: Eliminate/reduce an operation $5,835 $2,320 $(-1,016.0)
(-24,300)
kWh
$(-80.0)
-
kW-mo/yr
- $6,931
07 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $770 $950 $770
18,428
kWh
- - -
08 2.7292: Lower ceiling to reduce conditioned space $1,495 $2,000 $1,495
35,754
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $431 $560 $176
4,205
kWh
$13
-
kW-mo/yr
- $242
10 2.4321: Upgrade obsolete equipment $7,911 $23,244 - - $7,911
-
MMBtu
-
11 2.4221: Install compressor air intakes in coolest locations $385 $1,496 $385
9,214
kWh
- - -
TOTAL RECOMMENDED $33,808 $34,408 $5,811
139,018
kWh
$220
-
kW-mo/yr
$20,604
-
MMBtu
$7,173
TOTAL IMPLEMENTED $24,862 $30,295 $4,003
95,760
kWh
$13
-
kW-mo/yr
$20,604
-
MMBtu
$242
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs