Assessment Year | 2015 |
---|---|
Principal Product | Fabricated Steel |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
100,000
ft2
|
Annual Production | 6,500
ton
|
Production Hrs. Annual | 2,652
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $31,400 | 472,880 |
kWh
|
$0.066 |
Electricity Demand | $28,931 | 2,936 |
kW-mo/yr
|
$9.85 |
Electricity Fees | $5,594 | - |
|
- |
Natural Gas | $33,358 | 6,342 |
MMBtu
|
$5.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,957 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,017 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7243: Improve air circulation with destratification fans / other methods | $8,070 | $3,930 |
$(-423.0)
(-6,365)
kWh
|
$(-165.0)
-
kW-mo/yr
|
$8,658
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $103 | $86 |
$41
613
kWh
|
$8
-
kW-mo/yr
|
- | $54 | |
03 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $1,174 | $1,020 |
$1,174
17,687
kWh
|
- | - | - | |
04 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $3,740 | $7,476 | - | - |
$3,740
-
MMBtu
|
- | |
05 | 2.7135: Install occupancy sensors | $66 | $132 |
$66
994
kWh
|
- | - | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,804 | $9,736 |
$(-1,746.0)
(-26,289)
kWh
|
$(-1,579.0)
-
kW-mo/yr
|
$6,129
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $15,957 | $22,380 |
$(-888.0)
(-13,360)
kWh
|
$(-1,736.0)
-
kW-mo/yr
|
$18,527
-
MMBtu
|
$54 | ||
TOTAL IMPLEMENTED | $5,017 | $8,582 |
$1,215
18,300
kWh
|
$8
-
kW-mo/yr
|
$3,740
-
MMBtu
|
$54 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs