ITAC Assessment: SU0395
ITAC logo
ITAC Assessment: SU0395
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Fabricated Steel
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 100,000
ft2
Annual Production 6,500
ton
Production Hrs. Annual 2,652
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,400 472,880
kWh
Electricity Demand $28,931 2,936
kW-mo/yr
Electricity Fees $5,594 -
Natural Gas $33,358 6,342
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,957 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,017

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7243: Improve air circulation with destratification fans / other methods $8,070 $3,930 $(-423.0)
(-6,365)
kWh
$(-165.0)
-
kW-mo/yr
$8,658
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $103 $86 $41
613
kWh
$8
-
kW-mo/yr
- $54
03 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $1,174 $1,020 $1,174
17,687
kWh
- - -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $3,740 $7,476 - - $3,740
-
MMBtu
-
05 2.7135: Install occupancy sensors $66 $132 $66
994
kWh
- - -
06 2.7447: Install vinyl strip / high speed / air curtain doors $2,804 $9,736 $(-1,746.0)
(-26,289)
kWh
$(-1,579.0)
-
kW-mo/yr
$6,129
-
MMBtu
-
TOTAL RECOMMENDED $15,957 $22,380 $(-888.0)
(-13,360)
kWh
$(-1,736.0)
-
kW-mo/yr
$18,527
-
MMBtu
$54
TOTAL IMPLEMENTED $5,017 $8,582 $1,215
18,300
kWh
$8
-
kW-mo/yr
$3,740
-
MMBtu
$54
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs