| Assessment Year | 2015 |
|---|---|
| Principal Product | Injection Molded Plastic Component Parts |
| NAICS | 326121: Unlaminated Plastics Profile Shape Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 907 |
| Plant Area |
900,173
ft2
|
| Annual Production | 2,275,000,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $2,370,757 | 56,064,161 |
kWh
|
$0.042 |
| Electricity Demand | $664,089 | 169,892 |
kW-mo/yr
|
$3.91 |
| Electricity Fees | $(-29,390.0) | - |
|
- |
| Natural Gas | $100,620 | 14,032 |
MMBtu
|
$7.17 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $27,221 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,613 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,788 | - |
$5,788
137,819
kWh
|
- | - | - | - | |
| 02 | 2.7122: Disconnect ballasts | $1,418 | - |
$1,203
28,641
kWh
|
$215
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4322: Use or replace with energy efficient substitutes | $516 | - |
$340
8,100
kWh
|
$176
-
kW-mo/yr
|
- | - | - | |
| 04 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $10,554 | $3,085 |
$10,554
251,288
kWh
|
- | - | - | - | |
| 05 | 2.7135: Install occupancy sensors | $402 | $158 |
$402
9,579
kWh
|
- | - | - | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $4,731 | $2,974 |
$4,731
112,643
kWh
|
- | - | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,064 | $2,148 |
$773
18,396
kWh
|
$99
-
kW-mo/yr
|
- | $1,532 | $660 | |
| 08 | 2.2136: Install / repair insulation on steam lines | $119 | $123 | - | - |
$119
-
MMBtu
|
- | - | |
| 09 | 2.6211: Conserve energy by efficient use of vending machines | $372 | $804 |
$372
8,850
kWh
|
- | - | - | - | |
| 10 | 2.4321: Upgrade obsolete equipment | $257 | $1,070 |
$228
5,431
kWh
|
$29
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $27,221 | $10,362 |
$24,391
580,747
kWh
|
$519
-
kW-mo/yr
|
$119
-
MMBtu
|
$1,532 | $660 | ||
| TOTAL IMPLEMENTED | $19,613 | $10,204 |
$16,998
404,708
kWh
|
$304
-
kW-mo/yr
|
$119
-
MMBtu
|
$1,532 | $660 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs