ITAC Assessment: SU0366
ITAC logo
ITAC Assessment: SU0366
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Bottled Beverages, Fruit Fiber Powder, Bulk Apple Juice
NAICS 312112: Bottled Water Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 250,000
ft2
Annual Production 46,845
Tgal
Production Hrs. Annual 5,163
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $499,817 9,075,721
kWh
Electricity Demand $157,227 24,437
kW-mo/yr
Electricity Fees $10,983 -
Natural Gas $130,391 14,417
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,311 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $368 - $223
4,050
kWh
$145
-
kW-mo/yr
- - -
02 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $25,532 $4,550 $25,532
464,213
kWh
- - - -
03 2.4221: Install compressor air intakes in coolest locations $14,414 $2,369 $14,414
262,068
kWh
- - - -
04 2.2136: Install / repair insulation on steam lines $3,336 $762 - - $3,336
-
MMBtu
- -
05 3.1161: Eliminate/reduce an operation $3,947 $2,284 $(-416.0)
(-7,560)
kWh
$(-231.0)
-
kW-mo/yr
- $1,071 $3,523
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,714 $1,131 $530
9,636
kWh
$85
-
kW-mo/yr
- $747 $352
TOTAL RECOMMENDED $49,311 $11,096 $40,283
732,407
kWh
$(-1.0)
-
kW-mo/yr
$3,336
-
MMBtu
$1,818 $3,875
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs