| Assessment Year | 2006 |
|---|---|
| Principal Product | Heavy-duty oil filters |
| NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $100 M to 500M |
| # of Employees | 500 |
| Plant Area |
580,000
ft2
|
| Annual Production | 30,000,000
pieces
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $594,135 | 20,060,581 |
kWh
|
$0.030 |
| Electricity Demand | $286,668 | 41,556 |
kW-mo/yr
|
$6.90 |
| Electricity Fees | $615 | - |
|
- |
| Natural Gas | $323,984 | 30,759 |
MMBtu
|
$10.53 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $67,613 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $65,063 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,713 | $40,358 |
$9,481
330,275
kWh
|
$4,232
-
kW-mo/yr
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $28,511 | $66,554 |
$20,097
700,239
kWh
|
$8,414
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,749 | $7,994 |
$3,922
136,660
kWh
|
$1,827
-
kW-mo/yr
|
- | |
| 04 | 2.7135: Install occupancy sensors | $1,893 | $3,850 |
$1,893
66,031
kWh
|
- | - | |
| 05 | 2.1213: Direct warmest air to combustion intake | $2,308 | $735 | - | - |
$2,308
-
MMBtu
|
|
| 06 | 2.4221: Install compressor air intakes in coolest locations | $2,268 | $2,268 |
$1,670
58,198
kWh
|
$598
-
kW-mo/yr
|
- | |
| 07 | 2.2437: Recover waste heat from equipment | $12,514 | $1,650 | - | - |
$12,514
-
MMBtu
|
|
| 08 | 2.4322: Use or replace with energy efficient substitutes | $657 | $1,300 |
$471
6,416
kWh
|
$186
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $67,613 | $124,709 |
$37,534
1,297,819
kWh
|
$15,257
-
kW-mo/yr
|
$14,822
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $65,063 | $119,559 |
$35,170
1,225,372
kWh
|
$15,071
-
kW-mo/yr
|
$14,822
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs