ITAC Assessment: SU0365
ITAC logo
ITAC Assessment: SU0365
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Bulk apple juice, teas, drinks
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 125,000
ft2
Annual Production 5,415
Tgal
Production Hrs. Annual 7,946
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,301 2,811,085
kWh
Electricity Demand $72,178 7,369
kW-mo/yr
Electricity Fees $118 -
Natural Gas $187,893 28,769
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,041 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,971

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,680 - $3,680
63,313
kWh
- -
02 2.4314: Use synthetic lubricant $3,020 - $2,408
41,454
kWh
$612
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,916 - $1,528
26,307
kWh
$388
-
kW-mo/yr
-
04 2.2511: Insulate bare equipment $5,139 $763 - - $5,139
-
MMBtu
05 2.2123: Insulate feedwater tank $686 $89 - - $686
-
MMBtu
06 2.2136: Install / repair insulation on steam lines $16,723 $4,216 - - $16,723
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,452 $1,050 $2,452
42,209
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $1,361 $2,353 $1,361
23,427
kWh
- -
09 2.7135: Install occupancy sensors $180 $317 $180
3,099
kWh
- -
10 2.2414: Use waste heat from hot flue gases to preheat $12,884 $49,000 - - $12,884
-
MMBtu
TOTAL RECOMMENDED $48,041 $57,788 $11,609
199,809
kWh
$1,000
-
kW-mo/yr
$35,432
-
MMBtu
TOTAL IMPLEMENTED $27,971 $5,583 $10,248
176,382
kWh
$1,000
-
kW-mo/yr
$16,723
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings