Assessment Year | 2014 |
---|---|
Principal Product | Bulk apple juice, teas, drinks |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $5 M to 10M |
# of Employees | 75 |
Plant Area |
125,000
ft2
|
Annual Production | 5,415
Tgal
|
Production Hrs. Annual | 7,946
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $163,301 | 2,811,085 |
kWh
|
$0.058 |
Electricity Demand | $72,178 | 7,369 |
kW-mo/yr
|
$9.79 |
Electricity Fees | $118 | - |
|
- |
Natural Gas | $187,893 | 28,769 |
MMBtu
|
$6.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,041 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,971 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,680 | - |
$3,680
63,313
kWh
|
- | - | |
02 | 2.4314: Use synthetic lubricant | $3,020 | - |
$2,408
41,454
kWh
|
$612
-
kW-mo/yr
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,916 | - |
$1,528
26,307
kWh
|
$388
-
kW-mo/yr
|
- | |
04 | 2.2511: Insulate bare equipment | $5,139 | $763 | - | - |
$5,139
-
MMBtu
|
|
05 | 2.2123: Insulate feedwater tank | $686 | $89 | - | - |
$686
-
MMBtu
|
|
06 | 2.2136: Install / repair insulation on steam lines | $16,723 | $4,216 | - | - |
$16,723
-
MMBtu
|
|
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,452 | $1,050 |
$2,452
42,209
kWh
|
- | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $1,361 | $2,353 |
$1,361
23,427
kWh
|
- | - | |
09 | 2.7135: Install occupancy sensors | $180 | $317 |
$180
3,099
kWh
|
- | - | |
10 | 2.2414: Use waste heat from hot flue gases to preheat | $12,884 | $49,000 | - | - |
$12,884
-
MMBtu
|
|
TOTAL RECOMMENDED | $48,041 | $57,788 |
$11,609
199,809
kWh
|
$1,000
-
kW-mo/yr
|
$35,432
-
MMBtu
|
||
TOTAL IMPLEMENTED | $27,971 | $5,583 |
$10,248
176,382
kWh
|
$1,000
-
kW-mo/yr
|
$16,723
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs