| Assessment Year | 2014 |
|---|---|
| Principal Product | Electrical Fittings |
| NAICS | 335932: Noncurrent-Carrying Wiring Device Manufacturing |
| SIC | 3644: Noncurrent-Carrying Wiring Devices |
| Sales Range | $100 M to 500M |
| # of Employees | 505 |
| Plant Area |
1,200,000
ft2
|
| Annual Production | 3,240,000
pieces
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $534,736 | 9,040,073 |
kWh
|
$0.059 |
| Electricity Demand | $99,266 | 35,828 |
kW-mo/yr
|
$2.77 |
| Electricity Fees | $4,677 | - |
|
- |
| Natural Gas | $398,038 | 67,082 |
MMBtu
|
$5.93 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $34,153 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $25,274 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $2,135 | - |
$2,135
36,180
kWh
|
- | - | - | - | |
| 02 | 2.4322: Use or replace with energy efficient substitutes | $376 | - |
$337
5,712
kWh
|
$39
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $10,756 | $1,527 |
$10,756
182,310
kWh
|
- | - | - | - | |
| 04 | 2.2136: Install / repair insulation on steam lines | $3,508 | $849 | - | - |
$3,508
-
MMBtu
|
- | - | |
| 05 | 2.6211: Conserve energy by efficient use of vending machines | $1,288 | $2,716 |
$1,288
21,830
kWh
|
- | - | - | - | |
| 06 | 2.4321: Upgrade obsolete equipment | $512 | $1,800 |
$482
8,170
kWh
|
$30
-
kW-mo/yr
|
- | - | - | |
| 07 | 3.1161: Eliminate/reduce an operation | $8,503 | $41,760 |
$(-266.0)
(-4,510)
kWh
|
$(-2,893.0)
-
kW-mo/yr
|
- | $2,140 | $9,522 | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,075 | $35,370 |
$4,835
81,950
kWh
|
$499
-
kW-mo/yr
|
- | $348 | $1,393 | |
| TOTAL RECOMMENDED | $34,153 | $84,022 |
$19,567
331,642
kWh
|
$(-2,325.0)
-
kW-mo/yr
|
$3,508
-
MMBtu
|
$2,488 | $10,915 | ||
| TOTAL IMPLEMENTED | $25,274 | $42,262 |
$19,496
330,440
kWh
|
$529
-
kW-mo/yr
|
$3,508
-
MMBtu
|
$348 | $1,393 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs