Assessment Year | 2014 |
---|---|
Principal Product | Plastic Consumer Product |
NAICS | 326140: Polystyrene Foam Product Manufacturing |
SIC | 3086: Plastics Foam Products |
Sales Range | $1 M to 5M |
# of Employees | 700 |
Plant Area |
500,000
ft2
|
Annual Production | 25,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $6,412,981 | 90,196,953 |
kWh
|
$0.071 |
Electricity Demand | $1,575,510 | 191,452 |
kW-mo/yr
|
$8.23 |
Natural Gas | $252,420 | 46,157 |
MMBtu
|
$5.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $66,001 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,264 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $14,245 | $685 |
$14,245
200,350
kWh
|
- | - | - | |
02 | 2.2437: Recover waste heat from equipment | $4,540 | $685 | - | - | - |
$4,540
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,074 | $3,375 |
$16,074
226,400
kWh
|
- | - | - | |
04 | 2.6211: Conserve energy by efficient use of vending machines | $1,863 | $3,874 |
$1,863
26,208
kWh
|
- | - | - | |
05 | 2.4321: Upgrade obsolete equipment | $1,190 | $3,188 |
$1,027
14,454
kWh
|
$163
-
kW-mo/yr
|
- | - | |
06 | 2.3212: Optimize plant power factor | $28,089 | $129,616 | - | - | $28,089 | - | |
TOTAL RECOMMENDED | $66,001 | $141,423 |
$33,209
467,412
kWh
|
$163
-
kW-mo/yr
|
$28,089 |
$4,540
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,264 | $6,563 |
$17,101
240,854
kWh
|
$163
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs