Assessment Year | 2022 |
---|---|
Principal Product | air compressors and blowers |
NAICS | 333912: Air and Gas Compressor Manufacturing |
SIC | 3563: Air and Gas Compressors |
Sales Range | $10 M to 50M |
# of Employees | 205 |
Plant Area |
330,000
ft2
|
Annual Production | 270,861
pieces
|
Production Hrs. Annual | 5,928
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $597,883 | 8,723,916 |
kWh
|
$0.069 | |
Electricity Demand | $71,725 | 35,358 |
kW-mo/yr
|
$2.03 | |
Natural Gas | $35,155 | 9,657 |
MMBtu
|
$3.64 | |
Waste Disposal Costs | |||||
Water Usage | $25,449 | 7,041 |
Tgal
|
$3.61 | |
Water Disposal | $47,556 | 7,041 |
Tgal
|
$6.75 | |
TOTAL YEARLY COSTS | $777,768 | ||||
RECOMMENDED SAVINGS* | $140,320 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $106,671 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $14,197 | $657 |
$14,197
205,754
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $21,760 | $11,000 |
$21,760
315,360
kWh
|
- | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $46,936 | $63,900 |
$42,853
621,051
kWh
|
$4,083
-
kW-mo/yr
|
- | |
04 | 3.4116: Meter recycled water (to reduce sewer charges) | $23,778 | $5,120 | - | - |
$23,778
-
Tgal
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $33,649 | $58,976 |
$27,175
393,847
kWh
|
$6,474
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $140,320 | $139,653 |
$105,985
1,536,012
kWh
|
$10,557
-
kW-mo/yr
|
$23,778
-
Tgal
|
||
TOTAL IMPLEMENTED | $106,671 | $80,677 |
$78,810
1,142,165
kWh
|
$4,083
-
kW-mo/yr
|
$23,778
-
Tgal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs