ITAC Assessment: MZ0321
ITAC logo
ITAC Assessment: MZ0321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product air compressors and blowers
NAICS 333912: Air and Gas Compressor Manufacturing
SIC 3563: Air and Gas Compressors
Sales Range $10
M
to 50
M
# of Employees 205
Plant Area 330,000
ft2
Annual Production 270,861
pieces
Production Hrs. Annual 5,928
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $597,883 8,723,916
kWh
Electricity Demand $71,725 35,358
kW-mo/yr
Natural Gas $35,155 9,657
MMBtu
Waste Disposal Costs
Water Usage $25,449 7,041
Tgal
Water Disposal $47,556 7,041
Tgal
TOTAL YEARLY COSTS $777,768
RECOMMENDED SAVINGS* $140,320 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $106,671

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.4239: Eliminate or reduce compressed air usage $14,197 $657 $14,197
205,754
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,760 $11,000 $21,760
315,360
kWh
- -
03 2.4239: Eliminate or reduce compressed air usage $46,936 $63,900 $42,853
621,051
kWh
$4,083
-
kW-mo/yr
-
04 3.4116: Meter recycled water (to reduce sewer charges) $23,778 $5,120 - - $23,778
-
Tgal
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $33,649 $58,976 $27,175
393,847
kWh
$6,474
-
kW-mo/yr
-
TOTAL RECOMMENDED $140,320 $139,653 $105,985
1,536,012
kWh
$10,557
-
kW-mo/yr
$23,778
-
Tgal
TOTAL IMPLEMENTED $106,671 $80,677 $78,810
1,142,165
kWh
$4,083
-
kW-mo/yr
$23,778
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs