ITAC Assessment: SU0352
ITAC logo
ITAC Assessment: SU0352
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Corrugated Paper Products
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $100
M
to 500
M
# of Employees 70
Plant Area 193,635
ft2
Annual Production 2,101,541
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,097 4,561,552
kWh
Electricity Demand $56,541 9,076
kW-mo/yr
Electricity Fees $117,188 -
Natural Gas $327,871 87,702
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,097 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,844

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $837 - $451
32,198
kWh
$386
-
kW-mo/yr
- - -
02 2.4322: Use or replace with energy efficient substitutes $263 - $76
5,400
kWh
$187
-
kW-mo/yr
- - -
03 2.7224: Reduce space conditioning during non-working hours $1,638 $267 - - - $1,638
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $628 $290 $61
4,353
kWh
$37
-
kW-mo/yr
- - $530
05 2.7135: Install occupancy sensors $743 $498 $743
53,053
kWh
- - - -
06 2.2136: Install / repair insulation on steam lines $1,473 $1,292 - - - $1,473
-
MMBtu
-
07 2.4221: Install compressor air intakes in coolest locations $281 $240 $281
20,095
kWh
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $384 $504 $118
8,424
kWh
$106
-
kW-mo/yr
- - $160
09 3.1161: Eliminate/reduce an operation $1,693 $3,338 $(-8.0)
(-555)
kWh
$(-336.0)
-
kW-mo/yr
- - $2,037
10 2.3212: Optimize plant power factor $5,157 $14,874 - - $5,157 - -
TOTAL RECOMMENDED $13,097 $21,303 $1,722
122,968
kWh
$380
-
kW-mo/yr
$5,157 $3,111
-
MMBtu
$2,727
TOTAL IMPLEMENTED $2,844 $2,080 $804
57,406
kWh
$37
-
kW-mo/yr
- $1,473
-
MMBtu
$530
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs