ITAC Assessment: SU0349
ITAC logo
ITAC Assessment: SU0349
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product CCD Sensors
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 263,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,930,427 21,397,000
kWh
Electricity Fees $255,426 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,281,892 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,811

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 4.821: Pay bills on time to avoid late fees $6,610 - - - $6,610
02 2.4226: Use / purchase optimum sized compressor $20,356 $4,000 $(-14,770.0)
(-164,112)
kWh
- $35,126
03 2.4221: Install compressor air intakes in coolest locations $4,244 $2,033 $4,244
47,156
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $457 $216 $87
963
kWh
- $370
05 2.2628: Utilize a less expensive cooling method $882,762 $552,244 $(-272,938.0)
(-3,032,640)
kWh
- $1,155,700
06 2.1392: Replace purchased steam with other energy source $361,538 $453,062 - $(-713,405.0)
-
MMBtu
$1,074,943
07 3.1161: Eliminate/reduce an operation $2,724 $5,760 $(-66.0)
(-732)
kWh
- $2,790
08 2.4321: Upgrade obsolete equipment $3,201 $8,460 $3,201
35,568
kWh
- -
TOTAL RECOMMENDED $1,281,892 $1,025,775 $(-280,242.0)
(-3,113,797)
kWh
$(-713,405.0)
-
MMBtu
$2,275,539
TOTAL IMPLEMENTED $9,811 $8,460 $3,201
35,568
kWh
- $6,610
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs