ITAC Assessment: SU0343
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Plastic & Plastic Products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 126
Plant Area 198,600
ft2
Annual Production 34,700,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $847,265 26,481,800
kWh
Electricity Demand $180,851 44,328
kW-mo/yr
Natural Gas $37,317 4,373
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,094 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,599

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $24,599 $3,200 $24,599
768,716
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $6,686 $1,270 $6,686
208,936
kWh
-
03 2.7224: Reduce space conditioning during non-working hours $461 $83 - $461
-
MMBtu
04 2.7135: Install occupancy sensors $1,051 $326 $1,051
32,850
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,297 $21,467 $6,297
196,224
kWh
-
TOTAL RECOMMENDED $39,094 $26,346 $38,633
1,206,726
kWh
$461
-
MMBtu
TOTAL IMPLEMENTED $24,599 $3,200 $24,599
768,716
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs