ITAC Assessment: SU0337
ITAC logo
ITAC Assessment: SU0337
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Digital Imaging Papers and Specialty Papers
NAICS 322299: All Other Converted Paper Product Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 143
Plant Area 400,000
ft2
Annual Production 6,500,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $357,527 5,917,416
kWh
Electricity Demand $62,529 13,815
kW-mo/yr
Electricity Fees $478 -
Natural Gas $67,913 8,718
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,704 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,665

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $85 - $58
960
kWh
$27
-
kW-mo/yr
- - - -
02 2.4221: Install compressor air intakes in coolest locations $1,848 $517 $1,848
30,801
kWh
- - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,655 $2,760 $4,655
77,584
kWh
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $469 $346 $158
2,628
kWh
$18
-
kW-mo/yr
- - $123 $170
05 2.2136: Install / repair insulation on steam lines $693 $895 - - - $693
-
MMBtu
- -
06 2.6211: Conserve energy by efficient use of vending machines $290 $596 $290
4,837
kWh
- - - - -
07 2.3212: Optimize plant power factor $6,664 $33,352 - - $6,664 - - -
TOTAL RECOMMENDED $14,704 $38,466 $7,009
116,810
kWh
$45
-
kW-mo/yr
$6,664 $693
-
MMBtu
$123 $170
TOTAL IMPLEMENTED $7,665 $4,518 $6,661
111,013
kWh
$18
-
kW-mo/yr
- $693
-
MMBtu
$123 $170
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs