ITAC Assessment: SU0332
ITAC logo
ITAC Assessment: SU0332
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Printed Circuits
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $100
M
to 500
M
# of Employees 900
Plant Area 570,141
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $585,849 9,657,191
kWh
Other Energy $280,325 31,703
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $109,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,766

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4226: Use / purchase optimum sized compressor $72,807 $28,851 $(-15,928.0)
(-262,838)
kWh
- $88,735
02 3.1161: Eliminate/reduce an operation $12,570 $7,200 $(-710.0)
(-11,700)
kWh
$2,352 $10,928
03 2.4133: Use most efficient type of electric motors $14,121 $10,392 $14,121
233,016
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,766 $1,320 - - $1,766
05 2.4321: Upgrade obsolete equipment $1,180 $5,512 $1,180
19,469
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,516 $37,508 $5,415
89,352
kWh
$1,296 $805
TOTAL RECOMMENDED $109,960 $90,783 $4,078
67,299
kWh
$3,648 $102,234
TOTAL IMPLEMENTED $1,766 $1,320 - - $1,766
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs