Assessment Year | 2011 |
---|---|
Principal Product | Flexible Drive Shafts |
NAICS | 333613: Mechanical Power Transmission Equipment Manufacturing |
SIC | 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 225 |
Plant Area |
250,000
ft2
|
Annual Production | 6,568,671
ton
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $202,878 | 3,050,987 |
kWh
|
$0.066 |
Electricity Demand | $35,156 | 11,486 |
kW-mo/yr
|
$3.06 |
Natural Gas | $221,064 | 25,448 |
MMBtu
|
$8.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $35,817 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,052 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $6,080 | - |
$5,413
83,283
kWh
|
$667
-
kW-mo/yr
|
- | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,162 | - |
$1,834
28,215
kWh
|
$328
-
kW-mo/yr
|
- | - | - | |
03 | 2.7122: Disconnect ballasts | $1,584 | - |
$1,480
22,776
kWh
|
$104
-
kW-mo/yr
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,822 | $177 |
$1,822
28,032
kWh
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $588 | $283 |
$251
3,767
kWh
|
$16
-
kW-mo/yr
|
- | - | $321 | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $545 | $175 |
$545
8,378
kWh
|
- | - | - | - | |
07 | 2.7314: Reduce ventilation air | $13,505 | $13,112 |
$639
8,928
kWh
|
$153
-
kW-mo/yr
|
- |
$12,713
-
MMBtu
|
- | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $308 | $450 |
$308
4,742
kWh
|
- | - | - | - | |
09 | 2.2414: Use waste heat from hot flue gases to preheat | $6,778 | $12,185 | - | - | - |
$6,778
-
MMBtu
|
- | |
10 | 2.6211: Conserve energy by efficient use of vending machines | $474 | $880 |
$474
7,296
kWh
|
- | - | - | - | |
11 | 2.3212: Optimize plant power factor | $1,695 | $15,783 | - | - | $1,695 | - | - | |
12 | 2.4112: Install soft-start to eliminate nuisance trips | $276 | $4,481 | - |
$276
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $35,817 | $47,526 |
$12,766
195,417
kWh
|
$1,544
-
kW-mo/yr
|
$1,695 |
$19,491
-
MMBtu
|
$321 | ||
TOTAL IMPLEMENTED | $23,052 | $18,931 |
$8,802
134,428
kWh
|
$1,216
-
kW-mo/yr
|
- |
$12,713
-
MMBtu
|
$321 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs