| Assessment Year | 2011 |
|---|---|
| Principal Product | refractory block |
| NAICS | 327120: Clay Building Material and Refractories Manufacturing |
| SIC | 3297: Nonclay Refractories |
| Sales Range | $500 k to 1M |
| # of Employees | 40 |
| Plant Area |
110,000
ft2
|
| Annual Production | 50,000
lb
|
| Production Hrs. Annual | 5,760
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $106,682 | 1,325,989 |
kWh
|
$0.080 |
| Natural Gas | $312,075 | 45,674 |
MMBtu
|
$6.83 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $35,072 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $27,344 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Gaseous Waste Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4322: Use or replace with energy efficient substitutes | $379 | - |
$223
3,780
kWh
|
$156
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,621 | $1,125 | - | - | - |
$12,621
-
lb
|
- | |
| 03 | 2.7135: Install occupancy sensors | $2,682 | $3,759 |
$2,682
45,465
kWh
|
- | - | - | - | |
| 04 | 2.4226: Use / purchase optimum sized compressor | $7,617 | $15,000 |
$(-5,981.0)
(-101,376)
kWh
|
$(-1,570.0)
-
kW-mo/yr
|
- | - | $15,168 | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,276 | $19,890 |
$6,799
115,232
kWh
|
$2,477
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.6211: Conserve energy by efficient use of vending machines | $111 | $313 |
$111
1,874
kWh
|
- | - | - | - | |
| 07 | 2.3212: Optimize plant power factor | $2,386 | $21,091 | - | - | $2,386 | - | - | |
| TOTAL RECOMMENDED | $35,072 | $61,178 |
$3,834
64,975
kWh
|
$1,063
-
kW-mo/yr
|
$2,386 |
$12,621
-
lb
|
$15,168 | ||
| TOTAL IMPLEMENTED | $27,344 | $45,865 |
$9,704
164,477
kWh
|
$2,633
-
kW-mo/yr
|
$2,386 |
$12,621
-
lb
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Gaseous Waste Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs