ITAC Assessment: SU0311
ITAC logo
ITAC Assessment: SU0311
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product refractory block
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3297: Nonclay Refractories
Sales Range $500
k
to 1
M
# of Employees 40
Plant Area 110,000
ft2
Annual Production 50,000
lb
Production Hrs. Annual 5,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,682 1,325,989
kWh
Natural Gas $312,075 45,674
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,072 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,344

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Gaseous Waste Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $379 - $223
3,780
kWh
$156
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,621 $1,125 - - - $12,621
-
lb
-
03 2.7135: Install occupancy sensors $2,682 $3,759 $2,682
45,465
kWh
- - - -
04 2.4226: Use / purchase optimum sized compressor $7,617 $15,000 $(-5,981.0)
(-101,376)
kWh
$(-1,570.0)
-
kW-mo/yr
- - $15,168
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,276 $19,890 $6,799
115,232
kWh
$2,477
-
kW-mo/yr
- - -
06 2.6211: Conserve energy by efficient use of vending machines $111 $313 $111
1,874
kWh
- - - -
07 2.3212: Optimize plant power factor $2,386 $21,091 - - $2,386 - -
TOTAL RECOMMENDED $35,072 $61,178 $3,834
64,975
kWh
$1,063
-
kW-mo/yr
$2,386 $12,621
-
lb
$15,168
TOTAL IMPLEMENTED $27,344 $45,865 $9,704
164,477
kWh
$2,633
-
kW-mo/yr
$2,386 $12,621
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Gaseous Waste Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs