ITAC Assessment: SU0304
ITAC logo
ITAC Assessment: SU0304
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Newspaper
NAICS 511110: Newspaper Publishers
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $1
M
to 5
M
# of Employees 61
Plant Area 12,960
ft2
Annual Production 2,808,000
pieces
Production Hrs. Annual 2,508
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,611 205,120
kWh
Electricity Demand $11,150 1,104
kW-mo/yr
Electricity Fees $1,771 -
Natural Gas $12,557 1,263
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,287 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,958

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.6231: Utilize controls to operate equipment only when needed $4,207 - $4,207
35,061
kWh
- - -
02 2.8121: Apply for tax-free status for energy purchases $992 - - - $992 -
03 2.4314: Use synthetic lubricant $202 - $141
1,179
kWh
$61
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $22 - $22
187
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $609 $539 $399
3,329
kWh
$51
-
kW-mo/yr
- $159
06 2.6211: Conserve energy by efficient use of vending machines $435 $467 $435
3,627
kWh
- - -
07 2.7135: Install occupancy sensors $214 $712 $214
1,784
kWh
- - -
08 2.4321: Upgrade obsolete equipment $737 $2,660 $564
4,702
kWh
$173
-
kW-mo/yr
- -
09 2.4112: Install soft-start to eliminate nuisance trips $869 $4,748 - $869
-
kW-mo/yr
- -
TOTAL RECOMMENDED $8,287 $9,126 $5,982
49,869
kWh
$1,154
-
kW-mo/yr
$992 $159
TOTAL IMPLEMENTED $5,958 $2,660 $4,793
39,950
kWh
$173
-
kW-mo/yr
$992 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs