| Assessment Year | 1993 |
|---|---|
| Principal Product | Milk and Cottage Cheese |
| NAICS |
n/a
|
| SIC | 2026: Fluid Milk |
| Sales Range | $10 M to 50M |
| # of Employees | 140 |
| Plant Area |
430,556
ft2
|
| Annual Production | 15,000
Tgal
|
| Production Hrs. Annual | 4,992
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $184,298 | 5,183,177 |
kWh
|
$0.036 |
| Natural Gas | $76,519 | 24,206 |
MMBtu
|
$3.16 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,472 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,222 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4321: Upgrade obsolete equipment | $15,428 | $3,583 | - |
$1,447
-
MMBtu
|
$13,981 | |
| 02 | 2.2511: Insulate bare equipment | $3,653 | $9,978 | - |
$3,653
-
MMBtu
|
- | |
| 03 | 2.1213: Direct warmest air to combustion intake | $986 | $2,400 | - |
$986
-
MMBtu
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,730 | $200 |
$1,730
48,652
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,620 | $1,120 |
$240
6,741
kWh
|
- | $1,380 | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $444 | $563 |
$208
5,862
kWh
|
- | $236 | |
| 07 | 2.7221: Lower temperature during the winter season and vice-versa | $1,611 | - |
$1,146
32,239
kWh
|
$465
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $25,472 | $17,844 |
$3,324
93,494
kWh
|
$6,551
-
MMBtu
|
$15,597 | ||
| TOTAL IMPLEMENTED | $19,222 | $5,466 |
$2,178
61,255
kWh
|
$1,447
-
MMBtu
|
$15,597 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs