ITAC Assessment: KU0407
ITAC logo
ITAC Assessment: KU0407
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Milk and Cottage Cheese
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 430,556
ft2
Annual Production 15,000
Tgal
Production Hrs. Annual 4,992
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,298 5,183,177
kWh
Natural Gas $76,519 24,206
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,472 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,222

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4321: Upgrade obsolete equipment $15,428 $3,583 - $1,447
-
MMBtu
$13,981
02 2.2511: Insulate bare equipment $3,653 $9,978 - $3,653
-
MMBtu
-
03 2.1213: Direct warmest air to combustion intake $986 $2,400 - $986
-
MMBtu
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,730 $200 $1,730
48,652
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,620 $1,120 $240
6,741
kWh
- $1,380
06 2.7142: Utilize higher efficiency lamps and/or ballasts $444 $563 $208
5,862
kWh
- $236
07 2.7221: Lower temperature during the winter season and vice-versa $1,611 - $1,146
32,239
kWh
$465
-
MMBtu
-
TOTAL RECOMMENDED $25,472 $17,844 $3,324
93,494
kWh
$6,551
-
MMBtu
$15,597
TOTAL IMPLEMENTED $19,222 $5,466 $2,178
61,255
kWh
$1,447
-
MMBtu
$15,597
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs