ITAC Assessment: SU0300
ITAC logo
ITAC Assessment: SU0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Biological Cultures
NAICS 325414: Biological Product (except Diagnostic) Manufacturing
SIC 2836: Biological Products, Except Diagnostic Substances
Sales Range $50
M
to 100
M
# of Employees 70
Plant Area 61,580
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $485,994 6,356,640
kWh
Other Energy $410,073 32,527
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,629 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,301

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Energy Savings
01 2.2113: Repair or replace steam traps $64,500 $3,122 - $64,500
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,801 $1,925 $5,801
75,336
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $828 $883 $828
10,758
kWh
-
04 2.7135: Install occupancy sensors $5,195 $8,204 $5,195
67,470
kWh
-
05 2.2449: Recover heat from exhausted steam, hot air or hot water $6,305 $11,140 - $6,305
-
MMBtu
TOTAL RECOMMENDED $82,629 $25,274 $11,824
153,564
kWh
$70,805
-
MMBtu
TOTAL IMPLEMENTED $70,301 $5,047 $5,801
75,336
kWh
$64,500
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs