ITAC Assessment: SU0297
ITAC logo
ITAC Assessment: SU0297
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Flooring Felts and Gaskets
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 464,000
ft2
Annual Production 45,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $919,942 15,744,243
kWh
Electricity Demand $331,778 41,573
kW-mo/yr
Electricity Fees $(-41,154.0) -
Natural Gas $266,351 40,351
MMBtu
Other Energy $689,742 152,510
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $438,864 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $114,703

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Energy Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $30,345 - $30,345
504,751
kWh
- - -
02 2.4322: Use or replace with energy efficient substitutes $2,367 - $1,361
22,680
kWh
$1,006
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $11,458 $697 $11,458
190,968
kWh
- - -
04 2.7134: Use photocell controls $1,997 $209 $1,997
33,276
kWh
- - -
05 2.2113: Repair or replace steam traps $29,835 $5,275 - - - $29,835
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,260 $650 $2,260
37,668
kWh
- - -
07 2.7135: Install occupancy sensors $5,273 $2,136 $5,273
87,879
kWh
- - -
08 2.3212: Optimize plant power factor $18,693 $24,129 - - $18,693 -
09 2.1392: Replace purchased steam with other energy source $314,524 $658,300 - - - $314,524
-
MMBtu
10 2.7142: Utilize higher efficiency lamps and/or ballasts $21,058 $45,795 $17,818
296,964
kWh
$3,240
-
kW-mo/yr
- -
11 2.4321: Upgrade obsolete equipment $1,054 $4,725 $894
14,892
kWh
$160
-
kW-mo/yr
- -
TOTAL RECOMMENDED $438,864 $741,916 $71,406
1,189,078
kWh
$4,406
-
kW-mo/yr
$18,693 $344,359
-
MMBtu
TOTAL IMPLEMENTED $114,703 $81,271 $62,775
1,045,243
kWh
$3,400
-
kW-mo/yr
$18,693 $29,835
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs