Assessment Year | 2010 |
---|---|
Principal Product | Flooring Felts and Gaskets |
NAICS | 322121: Paper (except Newsprint) Mills |
SIC | 2621: Paper Mills |
Sales Range | $50 M to 100M |
# of Employees | 120 |
Plant Area |
464,000
ft2
|
Annual Production | 45,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $919,942 | 15,744,243 |
kWh
|
$0.058 |
Electricity Demand | $331,778 | 41,573 |
kW-mo/yr
|
$7.98 |
Electricity Fees | $(-41,154.0) | - |
|
- |
Natural Gas | $266,351 | 40,351 |
MMBtu
|
$6.60 |
Other Energy | $689,742 | 152,510 |
MMBtu
|
$4.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $438,864 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $114,703 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Other Energy Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $30,345 | - |
$30,345
504,751
kWh
|
- | - | - | |
02 | 2.4322: Use or replace with energy efficient substitutes | $2,367 | - |
$1,361
22,680
kWh
|
$1,006
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $11,458 | $697 |
$11,458
190,968
kWh
|
- | - | - | |
04 | 2.7134: Use photocell controls | $1,997 | $209 |
$1,997
33,276
kWh
|
- | - | - | |
05 | 2.2113: Repair or replace steam traps | $29,835 | $5,275 | - | - | - |
$29,835
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,260 | $650 |
$2,260
37,668
kWh
|
- | - | - | |
07 | 2.7135: Install occupancy sensors | $5,273 | $2,136 |
$5,273
87,879
kWh
|
- | - | - | |
08 | 2.3212: Optimize plant power factor | $18,693 | $24,129 | - | - | $18,693 | - | |
09 | 2.1392: Replace purchased steam with other energy source | $314,524 | $658,300 | - | - | - |
$314,524
-
MMBtu
|
|
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,058 | $45,795 |
$17,818
296,964
kWh
|
$3,240
-
kW-mo/yr
|
- | - | |
11 | 2.4321: Upgrade obsolete equipment | $1,054 | $4,725 |
$894
14,892
kWh
|
$160
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $438,864 | $741,916 |
$71,406
1,189,078
kWh
|
$4,406
-
kW-mo/yr
|
$18,693 |
$344,359
-
MMBtu
|
||
TOTAL IMPLEMENTED | $114,703 | $81,271 |
$62,775
1,045,243
kWh
|
$3,400
-
kW-mo/yr
|
$18,693 |
$29,835
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Other Energy Savings |