ITAC Assessment: SU0294
ITAC logo
ITAC Assessment: SU0294
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Turbine Blades/Vanes
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 115,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $220,017 3,815,894
kWh
Electricity Demand $81,994 10,513
kW-mo/yr
Electricity Fees $5,645 -
Natural Gas $99,213 7,307
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,382 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,791

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $6,067 - $6,067
126,400
kWh
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,276 - $2,495
51,979
kWh
$781
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $3,995 $1,245 $3,995
83,118
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,763 $1,440 $3,763
78,400
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $267 $492 $67
1,664
kWh
$16
-
kW-mo/yr
- $184
06 2.7142: Utilize higher efficiency lamps and/or ballasts $142 $817 $111
3,245
kWh
$31
-
kW-mo/yr
- -
07 2.3212: Optimize plant power factor $1,808 $9,734 - - $1,808 -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,680 $17,732 $3,680
76,662
kWh
- - -
09 2.6211: Conserve energy by efficient use of vending machines $108 $516 $108
2,247
kWh
- - -
10 2.4321: Upgrade obsolete equipment $276 $1,831 $210
4,368
kWh
$66
-
kW-mo/yr
- -
TOTAL RECOMMENDED $23,382 $33,807 $20,496
428,083
kWh
$894
-
kW-mo/yr
$1,808 $184
TOTAL IMPLEMENTED $13,791 $4,580 $12,713
266,056
kWh
$894
-
kW-mo/yr
- $184
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs