| Assessment Year | 2009 |
|---|---|
| Principal Product | Printed, Flexible Packaging Films |
| NAICS | 326111: Plastics Bag and Pouch Manufacturing |
| SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
| Sales Range | $50 M to 100M |
| # of Employees | 205 |
| Plant Area |
155,000
ft2
|
| Annual Production | 15,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $520,005 | 10,244,019 |
kWh
|
$0.051 |
| Electricity Demand | $143,782 | 18,018 |
kW-mo/yr
|
$7.98 |
| Electricity Fees | $61,956 | - |
|
- |
| Natural Gas | $422,805 | 38,835 |
MMBtu
|
$10.89 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $264,405 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $137,599 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $95,326 | - | - | - | - | $95,326 | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,684 | - |
$8,801
172,572
kWh
|
$1,883
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $3,037 | - |
$2,502
49,056
kWh
|
$535
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7122: Disconnect ballasts | $2,387 | - |
$1,966
38,544
kWh
|
$421
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,090 | $460 |
$2,547
49,932
kWh
|
$543
-
kW-mo/yr
|
- | - | - | |
| 06 | 3.1191: Change procedures / equipment / operating conditions | $67,595 | $25,000 |
$(-5,272.0)
(-103,368)
kWh
|
$(-1,133.0)
-
kW-mo/yr
|
- | - | $74,000 | |
| 07 | 2.7135: Install occupancy sensors | $4,200 | $2,508 |
$4,200
82,344
kWh
|
- | - | - | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,299 | $18,800 |
$20,014
392,448
kWh
|
$4,285
-
kW-mo/yr
|
- | - | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $214 | $183 |
$58
1,139
kWh
|
$16
-
kW-mo/yr
|
- | - | $140 | |
| 10 | 2.2437: Recover waste heat from equipment | $53,384 | $69,621 | - | - |
$53,384
-
MMBtu
|
- | - | |
| 11 | 2.6211: Conserve energy by efficient use of vending machines | $189 | $642 |
$189
3,701
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $264,405 | $117,214 |
$35,005
686,368
kWh
|
$6,550
-
kW-mo/yr
|
$53,384
-
MMBtu
|
$95,326 | $74,140 | ||
| TOTAL IMPLEMENTED | $137,599 | $21,768 |
$35,562
697,296
kWh
|
$6,711
-
kW-mo/yr
|
- | $95,326 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs