ITAC Assessment: SU0274
ITAC logo
ITAC Assessment: SU0274
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Point of Sale Hardware
NAICS 333318: Other Commercial and Service Industry Machinery Manufacturing
SIC 3578: Calculating and Accounting Machines, Except Electronic Computers
Sales Range $100
M
to 500
M
# of Employees 370
Plant Area 208,700
ft2
Annual Production 20,233
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,700 2,814,487
kWh
Electricity Demand $130,034 8,586
kW-mo/yr
Electricity Fees $4,919 -
Natural Gas $11,120 1,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,266 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,897

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $11,264 - - - - - $11,264
02 2.8114: Change rate schedules or other changes in utility service $2,328 - - - - - $2,328
03 2.4314: Use synthetic lubricant $545 - $257
2,789
kWh
$288
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $498 - $44
482
kWh
$454
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,346 $400 $120
1,308
kWh
$1,226
-
kW-mo/yr
- - -
06 2.4221: Install compressor air intakes in coolest locations $316 $204 $28
304
kWh
$288
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $341 $268 $185
2,015
kWh
$45
-
kW-mo/yr
- $20 $91
08 2.7135: Install occupancy sensors $534 $595 $534
5,802
kWh
- - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $13,444 $21,840 $11,173
121,446
kWh
$2,271
-
kW-mo/yr
- - -
10 2.6211: Conserve energy by efficient use of vending machines $458 $720 $458
4,976
kWh
- - - -
11 2.3212: Optimize plant power factor $1,192 $7,749 - - $1,192 - -
TOTAL RECOMMENDED $32,266 $31,776 $12,799
139,122
kWh
$4,572
-
kW-mo/yr
$1,192 $20 $13,683
TOTAL IMPLEMENTED $3,897 $8,353 $449
4,883
kWh
$2,256
-
kW-mo/yr
$1,192 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs