ITAC Assessment: SU0267
ITAC logo
ITAC Assessment: SU0267
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Solenoids, Valves and LVDTs
NAICS 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 420
Plant Area 324,284
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 5,746
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $884,665 11,211,055
kWh
Electricity Demand $5,518 27,590
kW-mo/yr
Natural Gas $270,328 24,762
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,798 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,506

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
01 2.4322: Use or replace with energy efficient substitutes $7,704 - $7,584
96,000
kWh
$120
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $664 - $658
8,330
kWh
$6
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $730 - $726
9,193
kWh
$4
-
kW-mo/yr
-
04 2.7122: Disconnect ballasts $209 - $208
2,628
kWh
$1
-
kW-mo/yr
-
05 2.4314: Use synthetic lubricant $187 - $186
2,357
kWh
$1
-
kW-mo/yr
-
06 2.7122: Disconnect ballasts $3,272 $77 $3,255
41,199
kWh
$17
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,466 $1,031 $6,432
81,421
kWh
$34
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $2,367 $486 $2,367
29,965
kWh
- -
09 2.4221: Install compressor air intakes in coolest locations $5,959 $2,060 $5,924
74,986
kWh
$35
-
kW-mo/yr
-
10 3.1191: Change procedures / equipment / operating conditions $46,739 $23,800 - - $46,739
11 3.5145: Recover and reuse spent acid baths $1,453 $2,062 - - $1,453
12 2.6211: Conserve energy by efficient use of vending machines $185 $353 $185
2,347
kWh
- -
13 2.7142: Utilize higher efficiency lamps and/or ballasts $3,863 $9,244 $3,843
48,645
kWh
$20
-
kW-mo/yr
-
TOTAL RECOMMENDED $79,798 $39,113 $31,368
397,071
kWh
$238
-
kW-mo/yr
$48,192
TOTAL IMPLEMENTED $23,506 $13,251 $23,390
296,086
kWh
$116
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs